| 8961 | 25 Nov 2022 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage. | Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 8962 | 25 Nov 2022 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 8963 | 25 Nov 2022 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace I | WATER MAINEFOLD | |
| 8964 | 25 Nov 2022 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace II | WATER MAINEFOLD | |
| 8965 | 25 Nov 2022 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 2 | |
| 8966 | 25 Nov 2022 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 3 | |
| 8967 | 25 Nov 2022 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 1 | |
| 8968 | 24 Nov 2022 | Scheduled Maintenance | POLLUTION ID FANS FOR (Furnace 2)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
| Other | POLLUTION 2 | |
| 8969 | 24 Nov 2022 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1
LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | CHIPPING YARD CRANE NO. 1 | |
| 8970 | 24 Nov 2022 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | CHIPPING YARD CRANE NO. 2 | |