| 8471 | 03 Feb 2023 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 8472 | 03 Feb 2023 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 8473 | 03 Feb 2023 | Scheduled Maintenance | 1.check transformer temp. and oil level.
2. check transformer oil leakage.
3. check crystal color. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |
| 8474 | 03 Feb 2023 | Scheduled Maintenance | 1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |
| 8475 | 03 Feb 2023 | Scheduled Maintenance | 1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors. | Furnace I | FURNACE 1 TRANSFORMER | |
| 8476 | 03 Feb 2023 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD. | Furnace I | CHARGING CHUTES | |
| 8477 | 03 Feb 2023 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD. | Furnace II | CHARGING CHUTES | |
| 8478 | 02 Feb 2023 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 1 | |
| 8479 | 02 Feb 2023 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 2 | |
| 8480 | 02 Feb 2023 | Scheduled Maintenance | TELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.
| Other | TELPHER (FURNACE 1) | |