#DateTypeDetailsFurnaceEquipmentActions
802107 Apr 2023Scheduled MaintenanceELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 2
802207 Apr 2023Scheduled Maintenance ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 3
802307 Apr 2023Scheduled MaintenanceFURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IIHYDRAULIC POWER PACK NO. 1
802407 Apr 2023Scheduled MaintenanceFURNACE 2

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IIHYDRAULIC POWER PACK NO. 2
802507 Apr 2023Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil leakage.
3. check crystal color.
Furnace IIFURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR)
802607 Apr 2023Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors.
Furnace IIFURNACE 2 TRANSFORMER NO. 2
802707 Apr 2023Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors.
Furnace IFURNACE 1 TRANSFORMER
802807 Apr 2023Scheduled Maintenance1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD.
Furnace ICHARGING CHUTES
802907 Apr 2023Scheduled Maintenance1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD.
Furnace IICHARGING CHUTES
803007 Apr 2023Scheduled Maintenance1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage.
Furnace IHYDRAULIC POWER PACK NO. 1