606112 Jan 2024Scheduled MaintenanceELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 2
606212 Jan 2024Scheduled Maintenance ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 3
606312 Jan 2024Scheduled MaintenanceFURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IIHYDRAULIC POWER PACK NO. 1
606412 Jan 2024Scheduled MaintenanceFURNACE 2

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IIHYDRAULIC POWER PACK NO. 2
606512 Jan 2024Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil leakage.
3. check crystal color.
Furnace IIFURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR)
606612 Jan 2024Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors.
Furnace IIFURNACE 2 TRANSFORMER NO. 2
606712 Jan 2024Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors.
Furnace IFURNACE 1 TRANSFORMER
606812 Jan 2024Scheduled Maintenance1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD.
Furnace ICHARGING CHUTES
606912 Jan 2024Scheduled Maintenance1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD.
Furnace IICHARGING CHUTES
607012 Jan 2024Scheduled Maintenance1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage.