#FurnaceDateFromToDurationRemarks 
     
81Furnace I12 Feb 202609:00:00 pm09:45:00 pm1h 15minDue to E3 blower changing
82Furnace I10 Feb 202609:15:00 am09:25:00 am0h 10minDue to tighteng of bushing bolt to the transformer there was drops of oil lickege
83Furnace I06 Feb 202610:35:00 am11:30:00 am1h 5minDue to zesco power failure
84Furnace I05 Feb 202609:00:00 am09:40:00 am1h 20minDue to tie rod welding
85Furnace I23 Jan 202609:25:00 am10:00:00 am1h 25minElectrode no.3 pressuring bolt collar welding damage and electrode blowers cleaning also done.
86Furnace I16 Jan 202602:10:00 am03:10:00 am1h 0min Due to electrode no.1 clamps sparking and past putting inside clamps.
87Furnace I15 Jan 202603:00:00 pm03:20:00 pm0h 20minDue to all electrodes impellers cleaning
88Furnace I08 Jan 202606:00:00 pm06:10:00 pm0h 10minDue to High voltage..