Shutdowns

Showing 7,241-7,247 of 7,425 items.
#FurnaceDateFromToDurationRemarks 
     
7241Furnace II29 Apr 202101:50:00 am02:30:00 am1h 20minElectrode no 1 A6 clamp sparking and bolt tighti also spring changed and C4 clamp spring also change.
7242Furnace I29 Apr 202112:00:00 am12:50:00 am1h 10minElectrode no1 A1 clamp brazing
7243Furnace II29 Apr 202103:40:00 am11:05:00 am7h 25minElectrode no 1 all clamp insulation change
7244Furnace I28 Apr 202108:50:00 am09:25:00 am1h 25minDue to E3 C1 clam outlet water block problem
7245Furnace I27 Apr 202107:10:00 am09:50:00 pm15h 20minElectrode no 1 all contact clamps changing and pressuring tied rod changing.
7246Furnace I27 Apr 202101:40:00 am03:45:00 am2h 5min1= Electrode no1 sparking and water so putting paste in side clamps.
7247Furnace I26 Apr 202105:40:00 pm10:45:00 pm5h 5minElectrode no1 hydraulic hose pipe change. No1 electrode blower also change and Transformer oil top up.