Shutdowns
Showing 7,141-7,147 of 7,425 items.
| # | Furnace | Date | From | To | Duration | Remarks | |
|---|---|---|---|---|---|---|---|
| 7141 | Furnace II | 22 May 2021 | 12:10:00 am | 12:20:00 am | 0h 10min | Due to Ele no 3 sparking C3 bolt come out so tightening the bolts & C5 water leakage. | |
| 7142 | Furnace II | 21 May 2021 | 08:35:00 am | 10:55:00 am | 2h 20min | Electrode no3 sparking coming so we are punting paste inside the clamp. | |
| 7143 | Furnace II | 20 May 2021 | 10:35:00 am | 01:30:00 pm | 3h 5min | Electrode no1 A4 bolt damage then sparking coming so we changing the bolt and A4 tired rod changing | |
| 7144 | Furnace I | 19 May 2021 | 09:40:00 am | 11:05:00 am | 1h 25min | Due to Ele no 1 A2 & A6 clamp water leakage brazing side so brazing both sides. | |
| 7145 | Furnace I | 18 May 2021 | 10:15:00 am | 10:30:00 am | 0h 15min | Electrode no1 A3 clamp bolt came out. | |
| 7146 | Furnace I | 16 May 2021 | 08:25:00 am | 08:50:00 am | 0h 25min | Electrode no3 C1 clamp outlet water no coming and C2 clamp water leakage. | |
| 7147 | Furnace II | 15 May 2021 | 10:20:00 pm | 10:30:00 pm | 0h 10min | Due to electrode no 1 sparking bolts are tightening |