Shutdowns

Showing 6,981-6,988 of 7,425 items.
#FurnaceDateFromToDurationRemarks 
     
6981Furnace I16 Jun 202102:15:00 am02:25:00 am0h 10minIncomer high voltage trip
6982Furnace I16 Jun 202111:00:00 pm11:10:00 pm0h 10minDue to electrode length checking.
6983Furnace II14 Jun 202102:00:00 pm03:45:00 pm2h 15minDue to Ele no 3 C4 water leakage with sparking so putting pulp & putting paste in C3 , C4 & C6 clamps
6984Furnace II14 Jun 202110:10:00 am12:10:00 pm2h 0minEle no3 sparking coming there was hole 2nd electrode casing touched with starbeam and welding was done and 3rd electrode seal box asbest
6985Furnace I14 Jun 202107:05:00 am05:35:00 pm11h 30minElectrode no.3 C1 and C2 clamp changed, all electrode insulation checking .
6986Furnace II14 Jun 202109:35:00 am09:45:00 am0h 10minE3 sparking and bolt tight.
6987Furnace II14 Jun 202109:35:00 am09:45:00 am0h 10minElectrode no.1 C1 clamp sparking
6988Furnace I14 Jun 202101:30:00 am02:50:00 am1h 20minDue to E1 sparking problem, paste and mutty putting