Shutdowns

Showing 6,921-6,929 of 7,425 items.
#FurnaceDateFromToDurationRemarks 
     
6921Furnace II26 Jun 202104:40:00 pm04:50:00 pm0h 10minAll electrode insulation checking
6922Furnace II26 Jun 202111:10:00 am01:15:00 pm2h 5minAll electrode insulation checking
6923Furnace II26 Jun 202106:20:00 am06:35:00 am0h 15minElectrode no.1 sparking problem.
6924Furnace I26 Jun 202110:25:00 pm11:00:00 pm1h 25minElectrode no.1 slipping problem upper Clamp cylinder seal damage we are changed spare one.
6925Furnace II24 Jun 202111:10:00 pm11:20:00 pm0h 10minElectrode length checking
6926Furnace II23 Jun 202107:00:00 am07:00:00 pm12h 0min 11KV output cable B phase damage in 66 kv sub station.
6927Furnace I23 Jun 202107:00:00 am07:00:00 pm12h 0min 11KV output cable B phase damage in 66 kv sub station.
6928Furnace I22 Jun 202108:05:00 pm08:15:00 pm0h 10minDue to electrode length checking
6929Furnace I21 Jun 202108:05:00 pm08:15:00 pm0h 10minElectrode length checking.