Shutdowns

Showing 6,901-6,907 of 7,425 items.
#FurnaceDateFromToDurationRemarks 
     
6901Furnace I30 Jun 202108:30:00 am09:45:00 am1h 15minDue zesco power failure
6902Furnace I30 Jun 202104:40:00 pm05:00:00 pm0h 20minElectrode no1 slipping problem
6903Furnace II30 Jun 202108:30:00 am09:05:00 am1h 25minDue sesco power failure
6904Furnace II28 Jun 202110:05:00 am10:55:00 am1h 10minElectrode no.3 sparking problem, we are putting past inside the Clamp.
6905Furnace II28 Jun 202108:05:00 am08:25:00 am0h 20minElectrode no.3 C3 Clamp bolt coming out and changed.
6906Furnace II26 Jun 202104:40:00 pm04:50:00 pm0h 10minAll electrode insulation checking
6907Furnace II26 Jun 202111:10:00 am01:15:00 pm2h 5minAll electrode insulation checking