Shutdowns
Showing 6,321-6,328 of 7,425 items.
| # | Furnace | Date | From | To | Duration | Remarks | |
|---|---|---|---|---|---|---|---|
| 6321 | Furnace II | 19 Dec 2021 | 06:40:00 am | 08:10:00 am | 2h 30min | Due to E1 sparking we put paste inside the clamp and changing A4,A5 Bolts and C2 tierod changing | |
| 6322 | Furnace II | 19 Dec 2021 | 04:40:00 am | 05:50:00 am | 1h 10min | Due to E1 A1 and A6 mat and paste putting | |
| 6323 | Furnace I | 17 Dec 2021 | 06:15:00 am | 09:30:00 am | 3h 15min | Due to restricted earth fault in 11kV pannel at 66KV substation. | |
| 6324 | Furnace II | 17 Dec 2021 | 06:15:00 am | 09:00:00 am | 3h 15min | Due to Restricted earth fault in 11kv pannel at 66kv substation | |
| 6325 | Furnace I | 17 Dec 2021 | 08:05:00 pm | 08:20:00 pm | 0h 15min | Due to electrodes length checking. | |
| 6326 | Furnace II | 15 Dec 2021 | 03:05:00 am | 03:30:00 am | 0h 25min | Due to eletrode three 3 repairing | |
| 6327 | Furnace II | 15 Dec 2021 | 12:25:00 am | 01:25:00 am | 1h 0min | Dueto electrode three blower repairing | |
| 6328 | Furnace II | 15 Dec 2021 | 10:20:00 am | 11:09:00 am | 1h 11min | Electrode two blower bolt damage and changing the bolt |