Shutdowns
Showing 6,001-6,008 of 7,425 items.
| # | Furnace | Date | From | To | Duration | Remarks | |
|---|---|---|---|---|---|---|---|
| 6001 | Furnace I | 14 Apr 2022 | 08:05:00 am | 09:30:00 am | 1h 25min | Due to hood top hose pipe water leakage | |
| 6002 | Furnace II | 14 Apr 2022 | 03:00:00 pm | 07:15:00 pm | 4h 15min | Due to furnace 2 11kv outgoing CT control wire short circuit | |
| 6003 | Furnace I | 12 Apr 2022 | 12:55:00 am | 01:20:00 am | 0h 25min | Due to cp1 hose pipe water leakage and change | |
| 6004 | Furnace II | 11 Apr 2022 | 09:20:00 pm | 09:25:00 pm | 0h 5min | Due to high voltage trip | |
| 6005 | Furnace I | 11 Apr 2022 | 09:20:00 pm | 09:25:00 pm | 0h 5min | Due to high voltage trip | |
| 6006 | Furnace II | 10 Apr 2022 | 06:35:00 pm | 06:45:00 pm | 0h 10min | Zesco power failure. | |
| 6007 | Furnace I | 10 Apr 2022 | 12:00:00 am | 12:20:00 am | 0h 20min | E1 pressuring water pipe leakage | |
| 6008 | Furnace II | 10 Apr 2022 | 05:30:00 am | 05:45:00 am | 0h 15min | Due to high voltage |