Shutdowns
Showing 5,941-5,948 of 7,425 items.
| # | Furnace | Date | From | To | Duration | Remarks | |
|---|---|---|---|---|---|---|---|
| 5941 | Furnace II | 22 Apr 2022 | 11:45:00 pm | 11:55:00 pm | 0h 10min | Electrode length checking. | |
| 5942 | Furnace I | 22 Apr 2022 | 10:55:00 am | 11:05:00 am | 0h 10min | electrode no.1 A6 clamp bolt came out while slipping time | |
| 5943 | Furnace I | 21 Apr 2022 | 08:35:00 pm | 09:05:00 pm | 1h 30min | Due to AP1 water leakage | |
| 5944 | Furnace II | 21 Apr 2022 | 07:25:00 am | 07:30:00 am | 0h 5min | Due to high voltage | |
| 5945 | Furnace I | 21 Apr 2022 | 07:25:00 am | 07:30:00 am | 0h 5min | Due to high voltage | |
| 5946 | Furnace I | 20 Apr 2022 | 02:55:00 pm | 04:10:00 pm | 1h 15min | Electrode no.1 pressuring water pipe leakage we are making welding. | |
| 5947 | Furnace II | 20 Apr 2022 | 09:00:00 am | 09:25:00 am | 0h 25min | Electrode no.1 blower maintenance work. | |
| 5948 | Furnace I | 20 Apr 2022 | 09:45:00 am | 09:55:00 am | 0h 10min | Protection shield side sparking. |