Shutdowns
Showing 5,901-5,908 of 7,425 items.
| # | Furnace | Date | From | To | Duration | Remarks | |
|---|---|---|---|---|---|---|---|
| 5901 | Furnace II | 06 May 2022 | 05:05:00 pm | 05:10:00 pm | 0h 5min | Due to over current trip | |
| 5902 | Furnace I | 05 May 2022 | 01:10:00 pm | 01:40:00 pm | 1h 30min | Chute maintaining | |
| 5903 | Furnace I | 05 May 2022 | 02:15:00 am | 02:25:00 am | 0h 10min | Electrode length checking | |
| 5904 | Furnace I | 05 May 2022 | 07:55:00 pm | 08:30:00 pm | 1h 25min | E no 1 hydraulic pipe leakage | |
| 5905 | Furnace II | 04 May 2022 | 06:10:00 am | 06:30:00 am | 0h 20min | Due to incomer high voltage and water pump trip | |
| 5906 | Furnace I | 04 May 2022 | 06:10:00 am | 06:25:00 am | 0h 15min | Due to incomer high voltage and water pump trip | |
| 5907 | Furnace I | 03 May 2022 | 08:05:00 am | 10:05:00 am | 2h 0min | Due to electrode no1 silbox insulator changing and bolt also changing | |
| 5908 | Furnace I | 02 May 2022 | 02:05:00 pm | 04:10:00 pm | 2h 5min | Due to 1= Center hood pipe welding. 2=Ele no3 pressuring pipe welding. 3=Ele no1 Slipping cylinder f |