Maintenance Report

Search Filter:

Showing 241-250 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
24124 Apr 2026Scheduled Maintenance1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes.
Furnace IWATER MAINEFOLD
24224 Apr 2026Scheduled Maintenance1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes.
Furnace IIWATER MAINEFOLD
24324 Apr 2026Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 2
24424 Apr 2026Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 3
24524 Apr 2026Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 1
24623 Apr 2026Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 1
24723 Apr 2026Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 2

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 2
24823 Apr 2026Scheduled MaintenanceTELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.

OtherTELPHER (FURNACE 1)
24923 Apr 2026Scheduled MaintenanceTELPHER FOR F2

1. checking the bearing, rollers condition and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.

OtherTELPHER ( FURNACE 2)
25023 Apr 2026Scheduled MaintenancePOLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
OtherPOLLUTION 1