Ferrosys
Purchase Contract
Purchase Contract
Raw Material Inward
Lot Analysis
Production
Tapping Data
Consumption
Daily Production
Stock Transfer
Sales Contract
Sale Contract
Dispatch
Furnace Log
Logs
Slipping
Paste Levels
Paste Feeding
Casing Reading
Furnace Shutdown
Shift Summary
Maintenance
Maintenance
Maintenance Reminder
Additional Costs
Accident Log
Dispatch
Contract
Overview
Reports
Daily Production Report
Production Analysis Report
Consumption Report
Finished Goods Stock Report
Dispatch Report
Contract Report
Maintenance Report
Tapping Report
Raw Material Stock Report
Log Sheet
Cost Report
Settings
Buyer
Company Profile
Component
Currency
Equipments
Furnace
Lot
Products
Raw Materials
Reset Password
Slag
Supplier
Users
Weight Matrix
admin
Change Password
Log Out
0
See All Alerts
Maintenance Report
Select type of maintenance
Scheduled Maintenance
Breakdown Maintenance
Scheduled Shutdown
Breakdown Shutdown
Other
Search
Search Filter:
Showing
16,971-16,980
of
17,159
items.
Export Page Data
HTML
CSV
Text
Excel
PDF
JSON
#
Date
Type
Details
Furnace
Equipment
Actions
16971
10 Aug 2019
Breakdown Shutdown
due to electrode no 3 sparking.
Furnace 1
OTHERS
16972
09 Aug 2019
Breakdown Shutdown
due to high voltage in 66kv substation.
Furnace 1
OTHERS
16973
09 Aug 2019
Breakdown Shutdown
electrode no 1 (a4)clamp busber tube brazeing and electrode no 3 slipping dives changing.
Furnace 1
OTHERS
16974
09 Aug 2019
Breakdown Shutdown
due to electrode no 1 sparking.
Furnace 1
OTHERS
16975
09 Aug 2019
Breakdown Shutdown
furnace trip.due to high voltage in 66kv substation.
Furnace 2
OTHERS
16976
08 Aug 2019
Breakdown Shutdown
Due to electrode no 2 (B1)Hoise pipe water leakage
Furnace 1
OTHERS
16977
08 Aug 2019
Breakdown Shutdown
Due to over current trip
Furnace 1
OTHERS
16978
08 Aug 2019
Breakdown Shutdown
high voltage in 66kv substation
Furnace 1
OTHERS
16979
08 Aug 2019
Breakdown Shutdown
high voltage trip in 66kv substation
Furnace 2
OTHERS
16980
07 Aug 2019
Breakdown Shutdown
electrode pressing down
Furnace 1
OTHERS