Maintenance Report

Search Filter:

Showing 16,701-16,710 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1670111 Mar 2020Breakdown Maintenance Automotive maintenance
Tata tipper
Ignition switch and combination switch fitting is done.
OtherOTHERS
1670211 Mar 2020Breakdown MaintenanceAutomotive maintenance
Jcb bucket pin fitting is done.
OtherOTHERS
1670311 Mar 2020Breakdown MaintenanceAutomotive maintenance
Older no 2 transmission oil filling.
OtherOTHERS
1670411 Mar 2020Breakdown MaintenanceShipping yard crans LT WIRE fitting.

OtherOTHERS
1670511 Mar 2020Breakdown MaintenanceTapping section crane no 3 panel board welding and wiring checking.OtherOTHERS
1670610 Mar 2020Breakdown Maintenancewashing plant BC 1 adjusting and guiding rubber fitting are done.OtherOTHERS
1670710 Mar 2020Breakdown Maintenancewashing plant
2 new belt fitting for the crusher (C4500).
vibrator
2 new belt fitting (B 64) for the vibrator and adjust the motor.
OtherOTHERS
1670810 Mar 2020Breakdown Maintenanceshipping yard new crane
new chain sprocket system fitting for the LT.
OtherOTHERS
1670910 Mar 2020Scheduled Maintenancecooling tower
pump number 2
motor and coupling greasing and checking is done.
OtherOTHERS
1671010 Mar 2020Scheduled Maintenancepollution pump no 1
preventive maintenance is done.
OtherOTHERS