#DateTypeDetailsFurnaceEquipmentActions
1666117 Mar 2020Scheduled MaintenanceGranulation tank no 1
Pump no 1
Gland rope fitting is done.
OtherOTHERS
1666217 Mar 2020Breakdown MaintenanceWashing plant crusher
Its spring rod is broken.
So it's in breakdown.
OtherOTHERS
1666317 Mar 2020Breakdown MaintenanceLab muffle furnace new coil received.
It's fitted inside the muffle furnace and testing is ok up to 900 degree temp.
OtherOTHERS
1666417 Mar 2020Breakdown MaintenanceWashing plant convenor no 1
Limit switch is broken.
So we check the connection and fit it properly.
OtherOTHERS
1666517 Mar 2020Scheduled MaintenanceWashing plant panel cleaning ,checking and all loose connection tighting.OtherOTHERS
1666616 Mar 2020Breakdown MaintenancePollution 1 furnace 1
Water pumps motor fitting is done. Fitting gland rope for prevent from water leakage.
OtherOTHERS
1666716 Mar 2020Scheduled MaintenanceRMHS BELT CONVEYOR
BC 1, BC 4,BC 5, BC 6, BC 7 maintenance is done.
Conveyor no 1 belts condition is not because of material not falling properly from hopper.
OtherOTHERS
1666816 Mar 2020Breakdown Maintenancepollution no 1 f1
Water pumps motor changed by spare one and checking the connection now it's ok.
OtherOTHERS
1666916 Mar 2020Scheduled Shutdownheat exchanger fitting is done. Furnace IOTHERS
1667016 Mar 2020Scheduled ShutdownE2
hydraulic oil leakage from the upper clamp slipping cylinder.
we tight the nuts and also solve the slipping problem.
Furnace IIOTHERS