| 16651 | 19 Mar 2020 | Breakdown Maintenance | Shipping yard old crane
It's rope pulley broken.
So we change it by 5 ton rope pulley. | Other | OTHERS | |
| 16652 | 19 Mar 2020 | Breakdown Maintenance | Washing plant
Discharge conveyor
Drum changed and gear box servicing is done. | Other | OTHERS | |
| 16653 | 18 Mar 2020 | Breakdown Maintenance | Lab muffle furnace
Successfully testing is done.temp. up to 900 degree Celsius | Other | OTHERS | |
| 16654 | 18 Mar 2020 | Scheduled Maintenance | Both furnaces pollution id fans cleaning and start. | Other | OTHERS | |
| 16655 | 18 Mar 2020 | Scheduled Maintenance | Furnace 1
Granulation pump no 2
Motor terminal connection checking and tighting all terminal bolts.
Starter connection also checking and tighting loosen parts. | Other | OTHERS | |
| 16656 | 18 Mar 2020 | Scheduled Maintenance | Furnace 1
Graduation tank no 1
Pump no 1
We open the pump for maintenance and found inside slag and small piece of world.
Impeller condition is not good. Its fins and key section is crecked.we fitting a new key inside the impeller. | Other | OTHERS | |
| 16657 | 17 Mar 2020 | Breakdown Maintenance | Washing plant discharge conveyor flange coupling fitting is done. | Other | OTHERS | |
| 16658 | 17 Mar 2020 | Scheduled Maintenance | Washing plant crusher
Greasing is done. Also loosen belt is tight. | Other | OTHERS | |
| 16659 | 17 Mar 2020 | Breakdown Maintenance | Heat exchanger water pipe line fitting is done. | Furnace I | OTHERS | |
| 16660 | 17 Mar 2020 | Scheduled Maintenance | Granulation tank 1
Pump no 2
Impeller fitting is done. Testing is ok. | Other | OTHERS | |