Maintenance Report

Search Filter:

Showing 16,621-16,630 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1662126 Mar 2020Scheduled ShutdownWe change one small hose pipe for B2 clamp. It's damaged from the transformer section.Furnace IOTHERS
1662225 Mar 2020Breakdown MaintenanceShipping yard
Old crane is out from its rail due to break the LT shaft.
So we weld it and mount the wheel properly .
OtherOTHERS
1662325 Mar 2020OtherWe making covering sheet for furnace.OtherOTHERS
1662425 Mar 2020Scheduled Maintenancefurnace 1
Pollution ID FAN NO 2
We cut small part from bottom side by gas cutting and remove all dust which is about half part of the fan case.
Than we balance the impeller and tight all Plummer blocks bolts and greasing is done.
OtherOTHERS
1662524 Mar 2020Scheduled MaintenanceFurnace 1
Pollution ID fan no 1
All dust and impeller cleaning. Also impeller balancing is done.
Bearing bolts are too loose because of more vibration so we tight it and make a isolation.
OtherOTHERS
1662624 Mar 2020Breakdown MaintenanceFurnace 2
RMHS telpher
Its one wheel stuck because of fatigue loading. So we replace it by new arrangement of 5 ton.
OtherOTHERS
1662724 Mar 2020Scheduled Maintenancefurnace 1
Pollution 1
ID FAN NO 2
Motor terminal and pollution panel checking, cleaning and connection ttighting is done.
OtherOTHERS
1662824 Mar 2020Breakdown MaintenanceRMHS
vibrofeeder no 12 is not working. It's megnetic coil alignment problem. Now it's ok.
OtherOTHERS
1662924 Mar 2020Breakdown MaintenanceRMHS
BC 7 key again out from the coupling so we mount new key. Now it is ok.
OtherOTHERS
1663023 Mar 2020Scheduled MaintenanceRMHS
CONVEYOR NO 5,6,7,8 maintenance is done.
OtherOTHERS