| 16621 | 26 Mar 2020 | Scheduled Shutdown | We change one small hose pipe for B2 clamp. It's damaged from the transformer section. | Furnace I | OTHERS | |
| 16622 | 25 Mar 2020 | Breakdown Maintenance | Shipping yard
Old crane is out from its rail due to break the LT shaft.
So we weld it and mount the wheel properly . | Other | OTHERS | |
| 16623 | 25 Mar 2020 | Other | We making covering sheet for furnace. | Other | OTHERS | |
| 16624 | 25 Mar 2020 | Scheduled Maintenance | furnace 1
Pollution ID FAN NO 2
We cut small part from bottom side by gas cutting and remove all dust which is about half part of the fan case.
Than we balance the impeller and tight all Plummer blocks bolts and greasing is done. | Other | OTHERS | |
| 16625 | 24 Mar 2020 | Scheduled Maintenance | Furnace 1
Pollution ID fan no 1
All dust and impeller cleaning. Also impeller balancing is done.
Bearing bolts are too loose because of more vibration so we tight it and make a isolation. | Other | OTHERS | |
| 16626 | 24 Mar 2020 | Breakdown Maintenance | Furnace 2
RMHS telpher
Its one wheel stuck because of fatigue loading. So we replace it by new arrangement of 5 ton. | Other | OTHERS | |
| 16627 | 24 Mar 2020 | Scheduled Maintenance | furnace 1
Pollution 1
ID FAN NO 2
Motor terminal and pollution panel checking, cleaning and connection ttighting is done. | Other | OTHERS | |
| 16628 | 24 Mar 2020 | Breakdown Maintenance | RMHS
vibrofeeder no 12 is not working. It's megnetic coil alignment problem. Now it's ok. | Other | OTHERS | |
| 16629 | 24 Mar 2020 | Breakdown Maintenance | RMHS
BC 7 key again out from the coupling so we mount new key. Now it is ok. | Other | OTHERS | |
| 16630 | 23 Mar 2020 | Scheduled Maintenance | RMHS
CONVEYOR NO 5,6,7,8 maintenance is done. | Other | OTHERS | |