| 16541 | 09 Apr 2020 | Breakdown Maintenance | Automotive maintenance
Mahindra tractor
Front right side tyre pucher making is done. | Other | OTHERS | |
| 16542 | 09 Apr 2020 | Scheduled Shutdown | Electrode blower no.1 motor opened and changed the bearing both side (2nos) and motor connection given.
| Furnace I | OTHERS | |
| 16543 | 09 Apr 2020 | Scheduled Shutdown | BC 7 gear box fitting is done.
Now it's ok. | Other | OTHERS | |
| 16544 | 08 Apr 2020 | Scheduled Shutdown | E3 pressure ring fitting is done. | Furnace I | OTHERS | |
| 16545 | 08 Apr 2020 | Scheduled Shutdown | Cooling tower
PVC pipes hole making and threading is done. | Other | OTHERS | |
| 16546 | 08 Apr 2020 | Scheduled Shutdown | Tapping section bus bar plate work is in progress. | Other | OTHERS | |
| 16547 | 08 Apr 2020 | Scheduled Shutdown | Electrode cooling blower 2 and 3 is opened and it's motor bearing changed. | Other | OTHERS | |
| 16548 | 08 Apr 2020 | Scheduled Shutdown | RMHS
BC 5 and BC 7
Control panel blowering and tighting all loose connection. | Other | OTHERS | |
| 16549 | 08 Apr 2020 | Breakdown Maintenance | Tata tipper
Tank to hydraulic cylinder
Hose pipe leakage repairing is done. | Other | OTHERS | |
| 16550 | 07 Apr 2020 | Scheduled Shutdown | E3 Pressure ring work is in progress
| Furnace I | OTHERS | |