1654109 Apr 2020Breakdown MaintenanceAutomotive maintenance
Mahindra tractor
Front right side tyre pucher making is done.
OtherOTHERS
1654209 Apr 2020Scheduled ShutdownElectrode blower no.1 motor opened and changed the bearing both side (2nos) and motor connection given.
Furnace IOTHERS
1654309 Apr 2020Scheduled Shutdown BC 7 gear box fitting is done.
Now it's ok.
OtherOTHERS
1654408 Apr 2020Scheduled ShutdownE3 pressure ring fitting is done.Furnace IOTHERS
1654508 Apr 2020Scheduled ShutdownCooling tower
PVC pipes hole making and threading is done.
OtherOTHERS
1654608 Apr 2020Scheduled ShutdownTapping section bus bar plate work is in progress.OtherOTHERS
1654708 Apr 2020Scheduled ShutdownElectrode cooling blower 2 and 3 is opened and it's motor bearing changed.OtherOTHERS
1654808 Apr 2020Scheduled ShutdownRMHS
BC 5 and BC 7
Control panel blowering and tighting all loose connection.
OtherOTHERS
1654908 Apr 2020Breakdown MaintenanceTata tipper
Tank to hydraulic cylinder
Hose pipe leakage repairing is done.
OtherOTHERS
1655007 Apr 2020Scheduled ShutdownE3 Pressure ring work is in progress
Furnace IOTHERS