Maintenance Report

Search Filter:

Showing 16,531-16,540 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1653111 Apr 2020Scheduled ShutdownSlag granulation pipe line work is in progress.OtherOTHERS
1653210 Apr 2020Scheduled ShutdownTransformer secondary raiser bolt side oil leakage it was tighten and arrested with araldite glue.
Furnace IOTHERS
1653310 Apr 2020Scheduled MaintenanceBC-1,2 motor maintenance done and starter maintenance & tighten lose connection.
BC-2 cable sealing rope damage it was changed new one.
OtherOTHERS
1653410 Apr 2020Scheduled MaintenanceGround hopper vaibro feeder maintenance and alaignment also done.OtherOTHERS
1653510 Apr 2020Scheduled ShutdownFurnace side all maintenance is done.
Furnace IOTHERS
1653610 Apr 2020Scheduled Shutdown Cooling tower pipe fitting work is in progress.
OtherOTHERS
1653710 Apr 2020Scheduled MaintenanceFurnace 2
pollution side 3 gate fitting is done.
OtherOTHERS
1653810 Apr 2020Scheduled MaintenanceRMHS CONVEYOR
BC 1 and BC 3
Maintenance is done.
OtherOTHERS
1653909 Apr 2020Breakdown MaintenanceShipping yard old crane panel board shifting with bus bar line and all motors connection given.OtherOTHERS
1654009 Apr 2020Scheduled MaintenancePollution 1 and 2
Motor and starter cleaning and loose connection tighting is done.
Furnace IOTHERS