Maintenance Report

Search Filter:

Showing 16,521-16,530 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1652114 Apr 2020Breakdown Maintenancetapping section
crane no 3
its main cable damaged so we replace it by a new 12 meter cable.
OtherOTHERS
1652214 Apr 2020Breakdown Maintenancesubmersible pump near the cooling tower starter problem it was repaired.OtherOTHERS
1652313 Apr 2020Scheduled Maintenancetapping section crane no 1 and 2
motor and starter maintenance is done.
OtherOTHERS
1652413 Apr 2020Scheduled Maintenancefurnace 2 granulation motor and starter maintenance is done.OtherOTHERS
1652513 Apr 2020Scheduled Maintenancewashing plant panel board clean and lose connection tightening.OtherOTHERS
1652613 Apr 2020Scheduled MaintenanceWashing plant crusher
We greasing it.
OtherOTHERS
1652711 Apr 2020Scheduled ShutdownControl desh panel board blowering check and tighten all connection.
OtherOTHERS
1652811 Apr 2020Scheduled ShutdownCooling tower motor 1,2 maintenance done and starter connection also check & tighten.
OtherOTHERS
1652911 Apr 2020Scheduled ShutdownVaibro feeder panel board and PLC panel blowering and tighten all connection.OtherOTHERS
1653011 Apr 2020Scheduled ShutdownCooling tower pipe fitting is done. Nozzle fitting is reasoning.
OtherOTHERS