| 16491 | 18 Apr 2020 | Scheduled Maintenance | WASHING PLANT
TILTING HOPPER
1. greasing all bushes.
2.hydraulic pump and motor coupling.
3. checking the hydraulic oil level it is ok.
4. check hopper welding sections it is ok.
CONVEYOR NO 1
1. greasing of bearings.
2. lubrication of rollers and change damage rollers.
3. check belt status its small part is damaged we inform.
4. gearbox oil level checked it is ok.
5. check coupling and key it is ok.
6. check the drum condition it is ok.
7. check mounting frame welding condition it is ok.
8. check rollers condition and if not good then change.
CRUSHER
1. the crusher foundation checked it is ok.
2. V belts condition is ok.
3. greasing is done.
4.spring rod condition and gap between plates are ok.
VIBRATOR
1. the spring condition is checked it is ok.
2.V belts condition checked it is ok.
3. vibrations are good.
4.frame welding condition is ok.
ROLLER
1. roller speed is ok.
2.greasing of bearings.
3.gearbox oil level checked.
4. coupling and key checked it is ok and greasing done.
5. checked the drum condition.
6. checked the mounting frame welding condition.
7. wire mash condition is not good.
DISCHARGE CONVEYOR
1. greasing of bearings.
2. lubrication of rollers and change damage rollers.
3. check belt status its small part is damaged we inform.
4. gearbox oil level checked it is ok.
5. check coupling and key it is ok.
6. check the drum condition it is ok.
7. check mounting frame welding condition it is ok.
8. check rollers condition and if not good then change. | Other | OTHERS | |
| 16492 | 17 Apr 2020 | Scheduled Shutdown | Changing Contact clamp
We changing contact clamp of no C1 and
Change tie rod of Contact clamp no C2. | Furnace II | OTHERS | |
| 16493 | 17 Apr 2020 | Other | 1 nos Contact clamp casing is done. | Other | OTHERS | |
| 16494 | 17 Apr 2020 | Other | Furnace 1
Granulation tank
we cut one runner plate and tomorrow it will mount . | Other | OTHERS | |
| 16495 | 17 Apr 2020 | Scheduled Maintenance | For guest house kitchen
One gate fitting on main door. | Other | OTHERS | |
| 16496 | 17 Apr 2020 | Other | For mansa washing plant
One star delta connection starter waiting is complete and tested. | Other | OTHERS | |
| 16497 | 17 Apr 2020 | Other | Store wifi
2 nos cable connector changes.now it's working. | Other | OTHERS | |
| 16498 | 17 Apr 2020 | Other | Pm office internet cable not working so we fix it by fitting new 5 mtr. Cable | Other | OTHERS | |
| 16499 | 16 Apr 2020 | Other | wifi cable connection shifted from store to P.M. office. | Other | OTHERS | |
| 16500 | 16 Apr 2020 | Other | UPS connection given for safal app server in the office. | Other | OTHERS | |