| 16471 | 21 Apr 2020 | Other | for lab spare muffle furnace coil making is done. | Other | OTHERS | |
| 16472 | 21 Apr 2020 | Breakdown Maintenance | shipping yard oil crane
its current collector plate was coming out. we fix it in right position and now crane is working. | Other | OTHERS | |
| 16473 | 21 Apr 2020 | Breakdown Maintenance | tapping section
crane no 2 its main supply cable cutting so we change 5 mtr cable and now it is working. | Other | OTHERS | |
| 16474 | 21 Apr 2020 | Other | guest house
2 LED, 3 CFL, AND 2 TUBE LIGHTS FITTING IS DONE. | Other | OTHERS | |
| 16475 | 20 Apr 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 & ALL VIBRATORS
1. check motor condition ( amp, volt, and connectivity) is ok. no noise coming from motors.
2. panel board checked, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. all limit switches and wires working properly.
5.checked Vibro feeder's coil connection, its condition, and it's working properly. | Other | OTHERS | |
| 16476 | 20 Apr 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings is done.
2. lubrication of rollers and check conditions. some rollers condition is not ok for BC1 and BC3 we inform it.
3. belt status checked and also check tightness, speed. BC 6 and BC 1 belts small part is damaged.
4. gearbox oil level checked it is ok. for BC 7 gearbox oil seal is not ok but no leakage.
5.coupling and key checked and greasing is done.
6. drum condition is ok.
7.mounting frame welding condition is ok.
| Other | OTHERS | |
| 16477 | 20 Apr 2020 | Scheduled Maintenance | washing plant crusher out and make plates arrangement. | Other | OTHERS | |
| 16478 | 20 Apr 2020 | Breakdown Maintenance | washing plant
roller wire mesh changed by a new one. | Other | OTHERS | |
| 16479 | 20 Apr 2020 | Breakdown Maintenance | electrode cooling blower no 2
it is making too much noise and vibration. we do balancing. now it is ok. | Furnace II | OTHERS | |
| 16480 | 20 Apr 2020 | Breakdown Maintenance | 2 tubeligts one from store and other from main gate changed. | Other | OTHERS | |