| 16461 | 22 Apr 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1,2, AND
3RD FLOOR carbon paste lifting crane
LT.
1. coupling, shaft, and pedestal bearing condition checked and greasing is done.
2. the gearbox oil level checked. No leakage.
3. checked all fasteners and mounting bolts.
4. checked frame welding conditions.
5. checked end traveling gears condition and do the greasing it is ok.
CT.
1. coupling, shaft, and pedestal bearing condition checked and greasing is done.
2. checked the gearbox oil level.
For crane no 2 ct gear box has leakage.
3. checked all fasteners and mounting bolts.
4. checked frame welding conditions.
5. checked end traveling gears condition and do the greasing.
HT.
1. checked rope drum, hook, rope condition.
2. checked the thruster drum condition and its brake tightness.
3. checked all fasteners and mounting bolts.
4. checked frame welding conditions. | Other | OTHERS | |
| 16462 | 22 Apr 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1,2,3 AND
3RD FLOOR CARBON PASTE LIFTING CRANE
LT.
1. motor condition is good. ( amp, volt, and connectivity). no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition.
CT.
1. motor condition is good. ( amp, volt, and connectivity). no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition.
HT.
1. motor condition is good. ( amp, volt, and connectivity). no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition.
| Other | OTHERS | |
| 16463 | 22 Apr 2020 | Breakdown Maintenance | charging chute no 1
some material is stuck in the chute pipe line. so we cut a small square plate and remove the material. now it's ok. | Furnace II | OTHERS | |
| 16464 | 22 Apr 2020 | Breakdown Maintenance | intercom stabilizer not working. its transformer wire has burn by a short circuit. so we open it and repair it. now its working. | Other | OTHERS | |
| 16465 | 22 Apr 2020 | Other | 50 hp spare motor for Mansa
it is checked and greasing is done.f | Other | OTHERS | |
| 16466 | 21 Apr 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1
coupling checking and greasing are done. motor checking and greasing are done.
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1
we fit 2 nos rubber bush for protecting the motor from water leakage.
FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1
1.pump condition and discharge checked.
2.coupling condition, alignment, and greasing done.
3.pipelines and valve's condition checked. it is ok.
4. check cooling towers nozzles condition. it is ok. | Other | OTHERS | |
| 16467 | 21 Apr 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1.motor condition ( amp, volt, and connectivity) checked no noise coming.
2. panel board checked, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing for pump 1 is done.
| Other | OTHERS | |
| 16468 | 21 Apr 2020 | Breakdown Maintenance | ELECTRODE COOLING BLOWER NO 2
it is changed and the new one blower is working. | Furnace II | OTHERS | |
| 16469 | 21 Apr 2020 | Breakdown Maintenance | SHIPPING YARD NEW CRANE
ITS L.T. chain sprocket chain out so we out chain again and now it's working. | Other | OTHERS | |
| 16470 | 21 Apr 2020 | Breakdown Maintenance | NEW SCREENER MACHINE AT SHIPPING YARD SECTION
its spring replaced now its working. | Other | OTHERS | |