| 16451 | 24 Apr 2020 | Breakdown Maintenance | hydraulic power pack control panel
2 pattern lock mounting is done. | Furnace I | OTHERS | |
| 16452 | 24 Apr 2020 | Breakdown Maintenance | F2
POLLUTION FAN
CLEAN AND STARTING. | Other | OTHERS | |
| 16453 | 24 Apr 2020 | Other | for Mansa
water pump foundation work is complete. | Other | OTHERS | |
| 16454 | 23 Apr 2020 | Scheduled Maintenance | SHIPPING YARD E.O.T. CRANE 1
LT.
1. checked coupling, shaft, and pedestal bearing.it is ok. and greasing is done.
2. checked the gearbox oil level, small grease filling is done.
3. checked all fasteners and mounting bolts.
4. checked frame welding conditions. it is ok.
5. one wheel making noise. we inform this problem.
CT.
1.grasing of the bearing is done.
2. checked all fasteners and mounting bolts.
3. checked frame welding conditions.
HT.
1. checked rope drum, hook, rope condition. it is ok.
shipping yard E.O.T. crane no 2 ( new crane)
its L.T. travel chain sprocket is damaged due to heavy friction.
TELPHER FOR F1, F2
1. checked the bearing, rollers condition.it is ok. lubrication is done.
2. checked frames welding condition.it Is ok.
3. checked cotter pin and its failure condition.it is ok.
POLLUTION ID FANS FOR F1, F2
1. open cover and clean dust now it is ok. we daily clean before starting it.
2. check v belts condition and inform if its on critical stage.
3. check foundation bolts and nuts of Plummer blocks.it is tighten. now it is ok.
4. The greasing of Plummer blocks is done.
5. checked stack condition.it is ok. | Other | OTHERS | |
| 16455 | 23 Apr 2020 | Scheduled Maintenance | SHIPPING YARD E.O.T. CRANE 1
LT.
1.checked motor condition. no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition.
CT.
1.checked motor condition. no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition.
HT.
1.checked motor condition. no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition.
TELPHER FOR F1, F2
1.checked motor condition. no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
POLLUTION ID FANS FOR F1, F2
1.checked motor condition. no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Other | OTHERS | |
| 16456 | 23 Apr 2020 | Other | one copper contact clamp welding is done. | Other | OTHERS | |
| 16457 | 23 Apr 2020 | Breakdown Maintenance | RMHS bunker plate welding is done. | Other | OTHERS | |
| 16458 | 23 Apr 2020 | Other | spare muffle furnace coil checking and tested now it's working. | Other | OTHERS | |
| 16459 | 23 Apr 2020 | Other | for Mansa
star delta starter with cover is ready. | Other | OTHERS | |
| 16460 | 23 Apr 2020 | Breakdown Maintenance | one welding machine is not working so we repair it now it's working. | Other | OTHERS | |