| 16421 | 29 Apr 2020 | Scheduled Maintenance | LT.
1. motor condition is good. ( amp, volt, and connectivity). no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition.
CT.
1. motor condition is good. ( amp, volt, and connectivity). no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition.
HT.
1. motor condition is good. ( amp, volt, and connectivity). no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition. | Other | TAPPING SEC. CRANE NO. 3 | |
| 16422 | 29 Apr 2020 | Breakdown Maintenance | It's pipe is damaged so we cut it and fix the problem. | Other | POLLUTION 2 | |
| 16423 | 28 Apr 2020 | Other | for Mansa
floating drum work is complete. | Other | OTHERS | |
| 16424 | 28 Apr 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1
FURNACE 1
GRANULATION PUMP 1,2
POLLUTION WATER PUMP NO 1
FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
WASHING PLANT SUBMERSIBLE PUMP 1
1. checked the pump condition and check discharge.it is ok.
2. checked coupling condition, alignment, and greasing are done.
3. checked pipelines and valve's condition.it is ok.
4. checked cooling towers nozzles condition. we change 3 nozzles of the cooling tower. | Other | PUMP | |
| 16425 | 28 Apr 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. checked the motor condition. no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.is done.
| Other | PUMP | |
| 16426 | 28 Apr 2020 | Breakdown Maintenance | Shifting Limit switch of baching conveyor is not working so we change it. | Other | RMHS CONVEYOR | |
| 16427 | 28 Apr 2020 | Breakdown Maintenance | Pump no 1 motor conducors is jammed.so we change it by new one. | Other | GRANULATION TANK (FURNACE 2) | |
| 16428 | 27 Apr 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 & ALL VIBRATORS
1. checked the motor condition. no noise coming.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. checked limit switches and its condition. it is ok.
| Other | RMHS CONVEYOR | |
| 16429 | 27 Apr 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings is done.
2. check belt status BC 6 belt condition is not good. we inform it HOD.
3. gearbox oil level checked.
4. check coupling and key it is ok. greasing done.
5. checked the drum condition. its ok.
6. checked the mounting frame welding condition.
| Other | RMHS CONVEYOR | |
| 16430 | 27 Apr 2020 | Other | for Mansa
we check the water pump and start by giving supply from the DG set. its current and voltages also checking. it's working properly. | Other | OTHERS | |