| 16371 | 02 May 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
L.T.
1. check motor condition.
2. checked panel board, clean, & tight all loose parts.
4. check limit switches and its condition.it is ok.
CT.
1. check the motor condition. it is ok.
2.check limit switches and their condition.it is ok.
HT.
1. check the motor condition. it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 16372 | 02 May 2020 | Breakdown Maintenance | Its H.T. motor is internal short. So we making a replacement for it.
we replace this hoist motor by one old hoist system. | Other | CHIPPING YARD CRANE NO. 2 | |
| 16373 | 01 May 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check the motor condition. it is ok.
| Furnace I | ELECTRODE 2 | |
| 16374 | 01 May 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check the motor condition. it is ok.
| Furnace I | ELECTRODE 3 | |
| 16375 | 01 May 2020 | Scheduled Maintenance | FURNACE 1
1. check the motor condition. it is ok.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 16376 | 01 May 2020 | Scheduled Maintenance | FURNACE 1
1. check the motor condition. it is ok. | Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 16377 | 01 May 2020 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check the motor condition. it is ok.
| Furnace II | ELECTRODE 1 | |
| 16378 | 01 May 2020 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check the motor condition. it is ok. | Furnace II | ELECTRODE 2 | |
| 16379 | 01 May 2020 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check the motor condition. it is ok. | Furnace II | ELECTRODE 3 | |
| 16380 | 01 May 2020 | Scheduled Maintenance | FURNACE 2
1.1. check the motor condition. it is ok. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |