Maintenance Report
Search Filter:
Showing 16,351-16,360 of 17,159 items.
| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 16351 | 04 May 2020 | Scheduled Maintenance | ALL CONVEYORS BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 1. greasing of bearings. It is done. 2. lubrication of rollers and check conditions. BC 2 ITS ROLLER CONDITION IS NOT OK. WE FIX IT. NOW it's OK. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 2 AND BC 6 BELT CONDITION IS NOT OK. WE REPAIR BELT. NOW IT IS OK. 4. gearbox oil level check and if not then fill as per requirement. IT IS OK. 5. check coupling and key ( if damaged than inform and change) and do the greasing. IT IS OK. 6. check the drum condition. IT IS OK. 7. check mounting frame welding condition. IT IS OK. | Other | RMHS CONVEYOR | |
| 16352 | 04 May 2020 | Breakdown Shutdown | ITS ELECTRODE IS BROKEN. SO WE OUT IT. NOW FURNACE IS RUNNING. | Furnace I | ELECTRODE 2 | |
| 16353 | 04 May 2020 | Breakdown Maintenance | it's not working. so we check and find that LC 6 not shown in indication. it is repaired now it's ok. | Other | WEIGH BRIDGE | |
| 16354 | 04 May 2020 | Other | for Mansa starter to motor 60 meters cable arrangement is done. | Other | PUMP | |
| 16355 | 04 May 2020 | Breakdown Maintenance | its intercom not working. we find out the problem. its wire is cut so we repair it now it's ok. | Other | WEIGH BRIDGE | |
| 16356 | 04 May 2020 | Other | guest house side one CFL and tv room side one cfl fitting is done. | Other | OTHERS | |
| 16357 | 03 May 2020 | Breakdown Shutdown | HOOD WATER PIPE LEAKAGE. WE REPAIR IT. NOW, IT OK. | Furnace II | HOOD SECTION | |
| 16358 | 02 May 2020 | Scheduled Maintenance | TILTING HOPPER 1. greasing all bushes. It is done. 2.hydraulic pump and motor coupling. Checking but coupling condition is not good we in from it to HOD. 3. checking the hydraulic oil level and if not then fill. IT IS OK. 4. check hopper welding sections.IT IS OK. CONVEYOR NO 1 1. greasing of bearings. IT IS DONE. 2. lubrication of rollers and check conditions. SOME ROLLER CONDITION IS NOT GOOD WE INFORM IT TO HOD. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.IT IS OK. 4. gearbox oil level check and if not then fill as per requirement.IT IS OK. 5. check coupling and key ( if damaged than inform and change) and do the greasing.IT IS OK. 6. check the drum condition.IT IS OK. 7. check mounting frame welding condition.IT IS OK. CRUSHER WE OUT CRUSHER BECAUSE SMALL MATERIAL IS COMING FOR WASHING. VIBRATOR 1. check the spring condition.IT IS GOOD. 2. check V belts condition.ONE V BELT IS NOT GOOD SO WE FIT ONE OTHER. 3. check vibrations if not good then adjust.IT IS OK.FOR MORE VIBRATION WE increase weight. 4. check the frame welding condition. small frame is damage from spring side so we weld it. ROLLER 1. check roller speed.it is ok. 2.greasing of bearings.it is done. 3.gearbox oil level check and if not then fill as per requirement.it is checked. 4. check coupling and key ( if damaged than inform and change) and do the greasing.it is ok. 5. check the drum condition.it is ok 6. check the mounting frame welding condition.it is ok. DISCHARGE CONVEYOR 1. greasing of bearings.it is done.one bearing is damaged so we replace it. 2. lubrication of rollers and check conditions.some roller condition is not good we inform it to Hod. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.it is ok. 4. gearbox oil level check and if not then fill as per requirement.it is ok. 5. check coupling and key ( if damaged than inform and change) and do the greasing.it is ok. 6. check the drum condition.it is ok. 7. check mounting frame welding condition.it is ok.we weld one plate on discharge side. | Other | WASHING PLANT | |
| 16359 | 02 May 2020 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. It is ok. 2. check panel board, clean, & tight all loose parts.it is ok.we tight all loose connection. 3. all parts clean by hand blower. Cleaning is done. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. It's working. 5. check the high mast lights also.all lights are working. | Other | WASHING PLANT | |
| 16360 | 02 May 2020 | Breakdown Maintenance | We check the water pump and changed its gland rope due to heavy water leakage. | Other | WATER PUMP (WASHING PLANT) | |