| 16331 | 07 May 2020 | Breakdown Maintenance | It's C.T. Motor relay changed due to one phase nor continuity. Now it's ok. | Other | TAPPING SEC. CRANE NO. 2 | |
| 16332 | 06 May 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2
LT.
1. checked coupling, shaft, and pedestal bearing condition and do the greasing. we greasing all couplings.
2. checked the gearbox oil level it is ok. no leakage.
3. checked all fasteners and mounting bolts. we found that 3 bolt of gearbox foundation is not there. so we mount it. now it's ok.
4. checked frame welding conditions.it is ok.
5. checked end traveling gears condition. it is ok. and greasing is done.
CT.
1. checked coupling, shaft, and pedestal bearing condition and greasing done.
2. check the gearbox oil level. there is leakage in the gearbox. so we put some grease.
3. check all fasteners and mounting bolts. It is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition. it is ok. greasing is done.
HT.
1. check rope drum, hook, rope condition.it is ok. The greasing of wire rope is done.
2. check the thruster drum condition and its brake tightness. it is ok.
3. check all fasteners and mounting bolts. It is ok.
4. check frame welding conditions. it is ok.
| Other | TAPPING SEC. CRANE NO. 2 | |
| 16333 | 06 May 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE
LT.
1. checked coupling, shaft, it is ok.
2. check the gearbox oil level. it is ok. no leakage.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.it is ok.
CT.
roller and bearing condition is ok.
HT.
1. check rope drum, hook, rope condition.it is ok.
2. check frame welding conditions. it is ok.
| Other | CARBON PASTE LIFTING CRANE | |
| 16334 | 06 May 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2
LT, CT, HT
1. checked the motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts. we checked and tight all loose contacts in panel board.
3. all parts clean by hand blower.
4. checked limit switches and its condition. all limit switches and wires working properly.
| Other | TAPPING SEC. CRANE NO. 2 | |
| 16335 | 06 May 2020 | Breakdown Maintenance | its belt is broken from fasteners side. so we repair it now its ok. | Other | DUST CONVEYOR ( WASHING PLANT) | |
| 16336 | 06 May 2020 | Breakdown Maintenance | its pump no 1 is not working. we check it. after priming its working properly.now its ok. | Other | GRANULATION TANK (FURNACE 2) | |
| 16337 | 06 May 2020 | Breakdown Maintenance | wifi landline connection given from the lab side. it's working now. | Other | OTHERS | |
| 16338 | 06 May 2020 | Other | office side intercom connection gave with 10 meter. extended cable. | Other | OTHERS | |
| 16339 | 06 May 2020 | Other | for Mansa
200 W led lamp set arranged, 4 nos with 10 meter. cable each sets and 2 nos of switchboard also arrange. | Other | OTHERS | |
| 16340 | 05 May 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1. it is ok we greasing motor and coupling.
FURNACE 1
GRANULATION PUMP 1,2. it is ok. we greasing coupling. but pump 1 impeller condition is not ok.
SUBMERSIBLE PUMP 1,2. it is running.
POLLUTION WATER PUMP NO 1. we change gland rope due to leakage of water.now it is ok.
FURNACE 2
GRANULATION PUMP 1,2. check coupling condition and greasing is done.
POLLUTION WATER PUMP NO 1. check it. it is ok.
OFFICE SUBMERSIBLE PUMP 1. it's running.
WASHING PLANT SUBMERSIBLE PUMP 1. it is running.
1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
COOLING TOWER PIPELINE IS OK. AND ALL NOZZLE IS IN GOOD CONDITION. | Other | PUMP | |