Maintenance Report

Search Filter:

Showing 16,331-16,340 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1633107 May 2020Breakdown MaintenanceIt's C.T. Motor relay changed due to one phase nor continuity. Now it's ok.OtherTAPPING SEC. CRANE NO. 2
1633206 May 2020Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 2

LT.
1. checked coupling, shaft, and pedestal bearing condition and do the greasing. we greasing all couplings.
2. checked the gearbox oil level it is ok. no leakage.
3. checked all fasteners and mounting bolts. we found that 3 bolt of gearbox foundation is not there. so we mount it. now it's ok.
4. checked frame welding conditions.it is ok.
5. checked end traveling gears condition. it is ok. and greasing is done.

CT.
1. checked coupling, shaft, and pedestal bearing condition and greasing done.
2. check the gearbox oil level. there is leakage in the gearbox. so we put some grease.
3. check all fasteners and mounting bolts. It is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition. it is ok. greasing is done.

HT.
1. check rope drum, hook, rope condition.it is ok. The greasing of wire rope is done.
2. check the thruster drum condition and its brake tightness. it is ok.
3. check all fasteners and mounting bolts. It is ok.
4. check frame welding conditions. it is ok.
OtherTAPPING SEC. CRANE NO. 2
1633306 May 2020Scheduled Maintenance3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. checked coupling, shaft, it is ok.
2. check the gearbox oil level. it is ok. no leakage.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.it is ok.


CT.
roller and bearing condition is ok.

HT.
1. check rope drum, hook, rope condition.it is ok.
2. check frame welding conditions. it is ok.
OtherCARBON PASTE LIFTING CRANE
1633406 May 2020Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 2

LT, CT, HT
1. checked the motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts. we checked and tight all loose contacts in panel board.
3. all parts clean by hand blower.
4. checked limit switches and its condition. all limit switches and wires working properly.
OtherTAPPING SEC. CRANE NO. 2
1633506 May 2020Breakdown Maintenanceits belt is broken from fasteners side. so we repair it now its ok.OtherDUST CONVEYOR ( WASHING PLANT)
1633606 May 2020Breakdown Maintenanceits pump no 1 is not working. we check it. after priming its working properly.now its ok.OtherGRANULATION TANK (FURNACE 2)
1633706 May 2020Breakdown Maintenancewifi landline connection given from the lab side. it's working now.OtherOTHERS
1633806 May 2020Otheroffice side intercom connection gave with 10 meter. extended cable.OtherOTHERS
1633906 May 2020Otherfor Mansa
200 W led lamp set arranged, 4 nos with 10 meter. cable each sets and 2 nos of switchboard also arrange.
OtherOTHERS
1634005 May 2020Scheduled MaintenanceWATER CIRCULATION PUMP 1. it is ok we greasing motor and coupling.
FURNACE 1
GRANULATION PUMP 1,2. it is ok. we greasing coupling. but pump 1 impeller condition is not ok.
SUBMERSIBLE PUMP 1,2. it is running.
POLLUTION WATER PUMP NO 1. we change gland rope due to leakage of water.now it is ok.

FURNACE 2
GRANULATION PUMP 1,2. check coupling condition and greasing is done.
POLLUTION WATER PUMP NO 1. check it. it is ok.
OFFICE SUBMERSIBLE PUMP 1. it's running.
WASHING PLANT SUBMERSIBLE PUMP 1. it is running.

1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
COOLING TOWER PIPELINE IS OK. AND ALL NOZZLE IS IN GOOD CONDITION.
OtherPUMP