| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 16281 | 09 May 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. SHAFT CONDITION IS GOOD. 2. check the gearbox oil level, leakage, and fill if required. GRAR BOX HAS LEAKAGE. WE FILL GREASE INSIDE. 3. check all fasteners and mounting bolts. IT IS OK. 4. check frame welding conditions. IT IS OK. 5. check end traveling gears condition and do the greasing. CT. ITS GEARS ARE OK. WE CHECKED GEARBOX AND FILL SOME GRESE. HT. ROPE AND HOOK CONDITION IS GOOD. WE GRESEING ROPE. | Other | TAPPING SEC. CRANE NO. 1 | |
| 16282 | 09 May 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT, CT, HT 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. CHECKED MOTOR CONDITION AND IT IS GOOD. 2. check panel board, clean, & tight all loose parts. CLEAN AND TIGHTS ALL PARTS. 3. all parts clean by hand blower. 4. check limit switches and its condition. IT IS OK. | Other | TAPPING SEC. CRANE NO. 1 | |
| 16283 | 09 May 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. GREASING OF COUPLING AND SHAFT CONDITION IS GOOD. 2. check the gearbox oil level, leakage, and fill if required. GEARBOX IS OK. 3. check all fasteners and mounting bolts. IT IS OK. 4. check frame welding conditions. IT IS OK. 5. check end traveling gears condition and do the greasing. IT IS OK. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. IT IS OK. 2. check the gearbox oil level, leakage, and fill if required. GEARBOX IS OK.NO LEAKAGE. 3. check all fasteners and mounting bolts. IT IS OK. 4. check frame welding conditions. IT IS OK. 5. check end traveling gears condition and do the greasing. IT IS OK. HT. 1. check rope drum, hook, rope condition. greasing of rope. GREASING OF ROPE IS DONE. 2. check all fasteners and mounting bolts. it is ok. 3. check frame welding conditions. it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 16284 | 09 May 2020 | Breakdown Maintenance | vibrators bearing fitting is done. bearing no is 6313. we also fit 2 v belts which no is B 64. also fit 2 counterweights and well balanced. | Other | VIBRATOR SCREEN MACHINE ( WASHING PLANT) | |
| 16285 | 09 May 2020 | Scheduled Maintenance | TILTING HOPPER 1. greasing all bushes is done. 2.hydraulic pump and motor coupling.it is ok. But coupling condition is not good. 3. checking the hydraulic oil level and if not then fill.it is ok. 4. check hopper welding sections.it is ok. CONVEYOR NO 1 1. greasing of bearings is done. 2. lubrication of rollers and check conditions. It is ok. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.we change 2 belts belt no is B 63. 4. gearbox oil level check and if not then fill as per requirement. IT IS OK. WE FILL GRESE AND GEAR BOX OIL ALSO. 5. check coupling and key ( if damaged than inform and change) and do the greasing.IT IS OK. 6. check the drum condition.IT IS OK. 7. check mounting frame welding condition.IT IS OK. CRUSHER IT IS OUT DUE TO SMALL MATERIALS FOR WASHING. VIBRATOR 1. check the spring condition.IT IS OK. 2. check V belts condition.WE CHNAGE 2 BLTS NO IS B64. 3. check vibrations if not good then adjust.IT IS OK. 4. check the frame welding condition.IT IS OK. ROLLER 1. check roller speed.IT IS OK. 2.greasing of bearings IS DONE. 3.gearbox oil level check and if not then fill as per requirement.WE FILL SOME GRESE. 4. check coupling and key ( if damaged than inform and change) and do the greasing.IT IS OK. 5. check the drum condition.IT IS OK. 6. check the mounting frame welding condition.IT IS OK. DISCHARGE CONVEYOR 1. greasing of bearings IS DONE. 2. lubrication of rollers and check conditions.IT IS OK.WE CHANGE SOME ROLLERS AND RETURN ROLLERS. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.IT IS OK. NEW BELT B63. 4. gearbox oil level check and if not then fill as per requirement.WE FILL SOME GRESE AND GEAR BOX OIL. 5. check coupling and key ( if damaged than inform and change) and do the greasing.IT IS OK. 6. check the drum condition.IT IS OK. 7. check mounting frame welding condition.IT IS OK. WE WELDING SOME BREAK JOINTS. | Other | WASHING PLANT | |
| 16286 | 09 May 2020 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. CHECKED MOTOR AND ITS CONDITION. IT IS OK. 2. check panel board, clean, & tight all loose parts. CLEAN AND. TIGHTING ALL PARTS. 3. all parts clean by hand blower. IT IS OK. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. IT IS OK. 5. check the high mast lights also. IT IS OK. | Other | WASHING PLANT | |
| 16287 | 09 May 2020 | Breakdown Maintenance | It's servicing is done. All load cells bottom side and top side shaking balls also cleaned.we are changing 5 nos balls which are rusted. | Other | WEIGH BRIDGE | |
| 16288 | 09 May 2020 | Breakdown Maintenance | its water trolly front left side leaf spring is broken.we weld all plates and fitting is done. now its ok. | Other | TATA TIPPER | |
| 16289 | 08 May 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. checked coupling, shaft, and pedestal bearing condition and greasing done. 2. checked the gearbox oil level. it is ok. we put grease and no leakage found. 3. checked all fasteners and mounting bolts. we put coupling bolts now it's ok. 4. checked frame welding conditions.it is ok. 5. checked end traveling gears condition and greasing is done. CT. 1. checked coupling, shaft, and pedestal bearing condition and greasing done. 2. checked the gearbox oil level. it is ok. we put grease. 3. checked all fasteners and mounting bolts. It is ok. 4. checked frame welding conditions.it is ok. 5. checked end traveling gears condition and greasing is done. HT. 1. checked rope drum, hook, rope condition. The greasing of rope is done. 2. checked the thruster drum condition and its brake tightness.it is ok. 3. checked all fasteners and mounting bolts. it is ok. 4. checked frame welding conditions. it is ok. | Other | TAPPING SEC. CRANE NO. 3 | |
| 16290 | 08 May 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. checked the motor condition ( amp, volt, and connectivity). it is ok. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition.it is not ok we change it tomorrow. CT. 1. checked the motor condition ( amp, volt, and connectivity). it is ok. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition.it is not ok we change it tomorrow. HT. 1. checked the motor condition ( amp, volt, and connectivity). it is ok. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition.it is not ok we change it tomorrow. | Other | TAPPING SEC. CRANE NO. 3 | |