| 16271 | 12 May 2020 | Scheduled Shutdown | It's slipping bolt again tights so we open it and do the slipping. | Furnace II | ELECTRODE 1 | |
| 16272 | 12 May 2020 | Other | Control room control panel front desh wire dressing is done. | Other | CONTROL PANEL | |
| 16273 | 12 May 2020 | Other | Furnace 1 hydraulic power pack cable tray sand filling work is done. | Other | HYDRAULIC POWER PACK NO. 1 | |
| 16274 | 12 May 2020 | Other | Guest house side 3 nos tube light and 3 nos CFL fitting is done. | Other | OTHERS | |
| 16275 | 11 May 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.check motor and it's condition it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok.
| Other | RMHS CONVEYOR | |
| 16276 | 11 May 2020 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations.vibro feeders check and it is ok. | Other | RMHS VIBRO FEEDER | |
| 16277 | 11 May 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings is done.
2. lubrication of rollers and check conditions. It is ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.it is ok.
4. gearbox oil level check and if not then fill as per requirement. Fill free and it is ok.
5. check coupling and key ( if damaged than inform and change) and do the greasing.it is ok.
6. check the drum condition. It is ok.
7. check mounting frame welding condition. It is ok.
8. check rollers condition and if not good then change. It is ok.
| Other | RMHS CONVEYOR | |
| 16278 | 11 May 2020 | Scheduled Shutdown | Its A2 contact clamp is continue leakage. So we change it. | Furnace I | ELECTRODE 1 | |
| 16279 | 11 May 2020 | Other | Cleaning pollution tank and start pollution. | Furnace I | POLLUTION 1 | |
| 16280 | 11 May 2020 | Scheduled Maintenance | Baching weigh hopper all load cells cleans and checked. | Other | RMHS CONVEYOR | |