Maintenance Report
Search Filter:
Showing 16,231-16,240 of 17,159 items.
| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 16231 | 15 May 2020 | Breakdown Maintenance | lab electric stove not working. it was checked and find out the problem is its coil is damaged. so e replace it by spare one. now it's working. | Other | LAB EQUIPMENT | |
| 16232 | 15 May 2020 | Breakdown Maintenance | seal cooling blower not working. when we check it than its relay NC is not showing continuity. so we change it. now its working. | Furnace II | SEAL COOLING BLOWER | |
| 16233 | 15 May 2020 | Other | T.V. ROOM SIDE 2nos camera and one CFL fitting are done. | Other | GUEST HOUSE | |
| 16234 | 14 May 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Checking and greasing are done. It is ok. 2. check the gearbox oil level, leakage, and fill if required. No leakage but we fill grease. 3. check all fasteners and mounting bolts. It is OK. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. It is ok. 2. check the gearbox oil level, leakage, and fill if required. Leakage is there so we fill grease. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok. And greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope. It is ok. 2. check the thruster drum condition and its brake tightness. It is ok. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. It is ok. 5. gearbox is leakage and makes too much sound so we put grease. | Other | TAPPING SEC. CRANE NO. 3 | |
| 16235 | 14 May 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing.checked and greasing is done. 2. check the gearbox oil level, leakage, and fill if required. we found leakage so we fill some amount of grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is not ok. its shaft condition is not good. 5. check end traveling gears condition and do the greasing. it is ok. CT. gears are ok. it is good in condition. HT. 1. check rope drum, hook, rope condition. greasing of rope.rope greasing is done. it is in good condition. 2. check the thruster drum condition and its brake tightness.no thruster. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 16236 | 14 May 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. greasing is done. it is ok. 2. check the thruster drum condition and its brake tightness. no thruster. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 16237 | 14 May 2020 | Scheduled Maintenance | TELPHER FOR F1 1. checking the bearing, rollers condition, and do lubrication.check it is ok. 2. checking frames welding condition.it is ok. 3. checking cotter pin and its failure condition. it is ok. | Other | TELPHER (FURNACE 1) | |
| 16238 | 14 May 2020 | Scheduled Maintenance | TELPHER FOR F2 1. checking the bearing, rollers condition, and do lubrication.check it is ok. 2. checking frames welding condition.it is ok. 3. checking cotter pin and its failure condition. it is ok | Other | TELPHER ( FURNACE 2) | |
| 16239 | 14 May 2020 | Scheduled Maintenance | POLLUTION ID FANS (Furnace 1) 1. open cover and clean dust.clean and balancing is done. 2. check the balancing of impeller and vibration isolation.it is ok. 3. check v belts condition and inform if it's on critical stage.4nos belt is broken so we change it. belt no is 4450 4. check foundation bolts and nuts of Plummer blocks.it is ok. 5. greasing the Plummer blocks.greasing is done. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. it is ok. | Other | POLLUTION 1 | |
| 16240 | 14 May 2020 | Scheduled Maintenance | POLLUTION ID FANS FOR (Furnace 2) 1. open cover and clean dust.clean and balancing is done. 2. check the balancing of impeller and vibration isolation.it is ok. 3. check v belts condition and inform if it's on critical stage.it is ok. 4. check foundation bolts and nuts of Plummer blocks.it is ok. 5. greasing the Plummer blocks.greasing is done. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. it is ok. | Other | POLLUTION 2 | |