Maintenance Report

Search Filter:

Showing 16,201-16,210 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1620118 May 2020Breakdown MaintenanceFurnace floor cooling fan not working. It is repaired now it's ok.Furnace ICOOLING FAN
1620218 May 2020OtherFor mansa
7.5 hp motor arrangement is done.motor fan cover terminal box checking and fixing is done.
OtherBLUE OCEAN
1620318 May 2020OtherFor mansa
7.5 hp pump assembly is done. and for that flanges making is done.
OtherBLUE OCEAN
1620416 May 2020Scheduled MaintenanceTILTING HOPPER
1. greasing all bushes.it is done.
2.hydraulic pump and motor coupling. It is ok.
3. checking the hydraulic oil level and if not then fill. It is ok.
4. check hopper welding sections. It is ok.

CONVEYOR NO 1
1. greasing of bearings.it is done.
2. lubrication of rollers and check conditions. It is ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.it is ok.
4. gearbox oil level check and if not then fill as per requirement. We fill some grease.
5. check coupling and key ( if damaged than inform and change) and do the greasing.it is ok.
6. check the drum condition.it is ok.
7. check mounting frame welding condition.it is ok.
8. check rollers condition and if not good then change.some rockers are not good but it is ok.

CRUSHER
1. check the crusher foundation.
2. check V belts condition.
3. do greasing.
4. check spring rod condition and gap between plates.
Crusher is out due to small size of materials.

VIBRATOR
1. check the spring condition. It is ok.
2. check V belts condition.it is ok.
3. check vibrations if not good then adjust.it is ok.
4. check the frame welding condition.it is ok.bearing are in good condition.

ROLLER
1. check roller speed. It is ok.
2.greasing of bearings. It is done.
3.gearbox oil level check and if not then fill as per requirement. It is ok. We fill some amount of grease.
4. check coupling and key ( if damaged than inform and change) and do the greasing.it is ok.
5. check the drum condition. It is ok.
6. check the mounting frame welding condition.it is ok.

DISCHARGE CONVEYOR
1. greasing of bearings. It is done.
2. lubrication of rollers and check conditions. It is ok. All rollers are in good condition.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.it is ok
4. gearbox oil level check and if not then fill as per requirement.it is ok. We fill some amount of grease.
5. check coupling and key ( if damaged than inform and change) and do the greasing.it is ok. Greasing is done.
6. check the drum condition. We fit one P210 bearing.
7. check mounting frame welding condition.it is ok.
8. check rollers condition and if not good then change. It is OK .
OtherWASHING PLANT
1620516 May 2020Scheduled MaintenanceWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. All motors checked .It's in good condition.
2. check panel board, clean, & tight all loose parts.its clean and loose parts tight.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly. It is ok. Mechanical people weld it's foundation.
5. check the high mast lights also.it is ok.
OtherWASHING PLANT
1620616 May 2020Breakdown MaintenanceNew battery fitting is done.
Loder not starting we found the problem is battery is not good.so we replace 2 nos. Battery by new one.
OtherLODER NO. 9
1620716 May 2020Breakdown ShutdownIt's slipping cylinder has leakage. So we change it by spare one also tighting loose bolts of all cylinders.Furnace IELECTRODE 3
1620816 May 2020Breakdown MaintenanceWhen we doing schedule maintenance we see that it's one bearing is not rotate. Than we check it. It's broken so we changed it by new one.bearing no is P210.OtherCONVEYOR 2 ( WASHING PLANT)
1620915 May 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tighten loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 1
1621015 May 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 2

F1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tighten loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 2