| 16101 | 27 May 2020 | Breakdown Maintenance |
Pump no. 1
It's starter output yellow phase cable is burn. We out it's legs and replacing spare one. Now it's ok. | Other | COOLING TOWER | |
| 16102 | 26 May 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
POLLUTION WATER PUMP NO 1
FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
1. check the pump condition and check discharge.it is ok. all pumps running properly.
2. check coupling condition, alignment, and do greasing.greasing is done.
3. check pipelines and valve's condition. it's ok.
4. check cooling towers nozzles condition. it's ok. | Other | PUMP | |
| 16103 | 26 May 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. it's ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing. greasing is done. | Other | PUMP | |
| 16104 | 26 May 2020 | Breakdown Shutdown | It's contact clamp no A3 and A5 is leakaged.we change A5. We also repaired A3 and change its tie rod. | Furnace II | ELECTRODE 1 | |
| 16105 | 26 May 2020 | Other | Its pipe line work is in progress.
Its work is finish. | Other | POLLUTION 2 | |
| 16106 | 26 May 2020 | Breakdown Maintenance | Its insulator is damaged from current collector foundation bolts.so we changed 6 nos. Insulator. | Other | BUS BAR LINE ( CHIPPING YARD) | |
| 16107 | 26 May 2020 | Breakdown Maintenance | Pollution clean and start. | Other | POLLUTION 2 | |
| 16108 | 25 May 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. IT IS OK.
2. check panel board, clean, & tight all loose parts. CLEAN AND TIGHTENING ALL LOOSE PARTS.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.IT IS OK. | Other | RMHS CONVEYOR | |
| 16109 | 25 May 2020 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations.CHECKING AND ADJUSTING VIBRATION IS DONE. IT IS OK. | Other | RMHS VIBRO FEEDER | |
| 16110 | 25 May 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings. it is done.
2. lubrication of rollers and check conditions. it is ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed. ALL BELT CONVEYORS CONDITION IS OK EXCEPT BC 2. WE NEED TO CHANGE IT. WE INFORM IT TO HOD. WE CHANGE IT AS SOON AS POSSIBLE.
4. gearbox oil level check and if not then fill as per requirement. ALL GEARBOX ARE OK.
5. check coupling and key ( if damaged than inform and change) and do the greasing. IT IS OK. GREASING IS DONE.
6. check the drum condition. IT IS OK.
7. check mounting frame welding condition. IT IS OK.
8. check rollers condition and if not good then change. | Other | RMHS CONVEYOR | |