#DateTypeDetailsFurnaceEquipmentActions
1605130 May 2020Breakdown MaintenanceIncoming power cable is damaged. We replace it by new one spare cable. Now its working.OtherGRANULATION TANK (FURNACE 2)
1605229 May 2020Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 2

LT.
1. checked coupling, shaft, and pedestal bearing condition it is good. Greasing is done.
2. check the gearbox oil level. It is ok no leakage.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition. It is ok and greasing is done.

CT
1. checked coupling, shaft, and pedestal bearing condition it is good. Greasing is done.
2. check the gearbox oil level. It is ok no leakage.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition. It is ok and greasing is done.

HT
1. checked rope drum, hook, rope condition. It is ok.greasing of rope is done.
OtherCHIPPING YARD CRANE NO. 2
1605329 May 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 1
1605429 May 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 2
1605529 May 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 3
1605629 May 2020Scheduled MaintenanceFURNACE 1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tighten loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.it is ok.
Furnace IHYDRAULIC POWER PACK NO. 1
1605729 May 2020Scheduled MaintenanceFURNACE 1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tighten loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.it is ok.
Furnace IHYDRAULIC POWER PACK NO. 2
1605829 May 2020Scheduled Maintenance ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 1
1605929 May 2020Scheduled MaintenanceELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 2
1606029 May 2020Scheduled Maintenance ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 3