| 16051 | 30 May 2020 | Breakdown Maintenance | Incoming power cable is damaged. We replace it by new one spare cable. Now its working. | Other | GRANULATION TANK (FURNACE 2) | |
| 16052 | 29 May 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. checked coupling, shaft, and pedestal bearing condition it is good. Greasing is done.
2. check the gearbox oil level. It is ok no leakage.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition. It is ok and greasing is done.
CT
1. checked coupling, shaft, and pedestal bearing condition it is good. Greasing is done.
2. check the gearbox oil level. It is ok no leakage.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition. It is ok and greasing is done.
HT
1. checked rope drum, hook, rope condition. It is ok.greasing of rope is done. | Other | CHIPPING YARD CRANE NO. 2 | |
| 16053 | 29 May 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace I | ELECTRODE 1 | |
| 16054 | 29 May 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 2 | |
| 16055 | 29 May 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 16056 | 29 May 2020 | Scheduled Maintenance | FURNACE 1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tighten loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.it is ok. | Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 16057 | 29 May 2020 | Scheduled Maintenance | FURNACE 1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tighten loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.it is ok. | Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 16058 | 29 May 2020 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 1 | |
| 16059 | 29 May 2020 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |
| 16060 | 29 May 2020 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |