Maintenance Report
Search Filter:
Showing 16,041-16,050 of 17,159 items.
| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 16041 | 01 Jun 2020 | Breakdown Maintenance | its suction valve plate is damaged. we make a new one and fit it. its tank release valve also damaged. we repair it. now it's working. | Other | TILTING HOPPER ( WASHING PLANT) | |
| 16042 | 01 Jun 2020 | Scheduled Maintenance | we replace one damaged Plummer block. we also clean it and balancing is done. | Other | POLLUTION 2, ID FAN NO. 2 | |
| 16043 | 01 Jun 2020 | Breakdown Maintenance | NEW CABLE DRASSING PUMP AND ELECTRICAL SIDE IS DONE. | Other | GRANULATION TANK (FURNACE 2) | |
| 16044 | 01 Jun 2020 | Breakdown Maintenance | F1 submersible pump It's motor coil is damaged. We replace motor from washing plant submersible pump. Now it's working. | Other | SUBMERSIBLE PUMP | |
| 16045 | 01 Jun 2020 | Breakdown Maintenance | It's centre one is puncher. We repair it now it's Woking. | Other | TATA TIPPER | |
| 16046 | 30 May 2020 | Scheduled Maintenance | TILTING HOPPER 1. greasing all bushes.gresing is done. 2.hydraulic pump and motor coupling.it is ok.coupling condition is not ok. We change it next time. 3. checking the hydraulic oil level and if not then fill.it is ok. Level is good. 4. check hopper welding sections.it is ok. CONVEYOR NO 1 1. greasing of bearings.greasing is done. 2. lubrication of rollers and check conditions.we change 2 nos. Return doller. We dont have that size roller. So we change 5 toppers next time. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.belt condition is not good. Its have low thickness. We tight 4 nos. Belt clips on joint. 4. gearbox oil level check and if not then fill as per requirement.it is ok. We fill some grease.its foundation bolt is not good so we change it and mount 4nos bolt. 5. check coupling and key ( if damaged than inform and change) and do the greasing.it is ok. 6. check the drum condition.it is ok. 7. check mounting frame welding condition.it is ok. 8. check rollers condition and if not good then change. CRUSHER (crusher is out due to small size of material.) 1. check the crusher foundation. 2. check V belts condition. 3. do greasing. 4. check spring rod condition and gap between plates. VIBRATOR 1. check the spring condition.we tight loose belt. Now its ok. 2. check V belts condition.we change it next time. 3. check vibrations if not good then adjust.it is ok. 4. check the frame welding conditionits inside channel bolt is loose. We mount 3 nos. Bolts and tight all loose bolts. ROLLER 1. check roller speed.its is ok. 2.greasing of bearings.greasing is done. 3.gearbox oil level check and if not then fill as per requirement.gearbox oil level is good.we fill some grease also. Its foundation bolt is not tight. We tight it and 2 nos.bolts also fit there. 4. check coupling and key ( if damaged than inform and change) and do the greasing.greasing is done.we also change 2 nos. V Belts (B 83) 5. check the drum condition.it is ok. 6. check the mounting frame welding condition. It is ok. DISCHARGE CONVEYOR 1. greasing of bearings.greasing is done. 2. lubrication of rollers and check conditions.it is ok. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.it is ok. 4. gearbox oil level check and if not then fill as per requirement.it is ok. We fill some grease. 5. check coupling and key ( if damaged than inform and change) and do the greasing.it is ok. Cooking greasing is done. 6. check the drum condition.it is ok. 7. check mounting frame welding condition.it is not ok. We weld it. 8. check rollers condition and if not good then change. | Other | WASHING PLANT | |
| 16047 | 30 May 2020 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. All motors checked .It's in good condition. 2. check panel board, clean, & tight all loose parts.its clean and loose parts tight. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. It is ok. Mechanical people weld it's foundation. 5. check the high mast lights also.it is ok. | Other | WASHING PLANT | |
| 16048 | 30 May 2020 | Breakdown Maintenance | It's back bucket pin and bush hole is damaged. We make one new pin and 2Nos. Bushes.its repairing work is done. Now it's working. | Other | JCB 4DX | |
| 16049 | 30 May 2020 | Breakdown Maintenance | It's LT. one side coupling key is damaged. So we repaired it. Now it's ok. | Other | TAPPING SEC. CRANE NO. 2 | |
| 16050 | 30 May 2020 | Other | F1 GRANULATION It's runner making work is complete. | Other | GRANULATION TANK (FURNACE 1) | |