| 15991 | 05 Jun 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.clean but dust is too much.
2. check leakage of hydraulic oil. if it is then informed to HOD.small leakage we inform it to HOD. | Furnace I | ELECTRODE 1 | |
| 15992 | 05 Jun 2020 | Breakdown Maintenance | It's one side key is broken. We welding it. Now it's ok. | Other | TAPPING SEC. CRANE NO. 3 | |
| 15993 | 05 Jun 2020 | Breakdown Maintenance | One stone is stuck between roller drum and conveyor belt. So it's tighting and top side welding is broken. We weld it now it's ok. | Other | CONVEYOR 2 ( WASHING PLANT) | |
| 15994 | 05 Jun 2020 | Breakdown Maintenance | Its belt is loose. We tight it. Now its ok. | Other | VIBRATOR SCREEN MACHINE ( WASHING PLANT) | |
| 15995 | 05 Jun 2020 | Other | F1 POLLUTION SIDE
MOTOR SHIFTING, THAN connection given and pollution start. | Other | POLLUTION 1 | |
| 15996 | 05 Jun 2020 | Breakdown Maintenance | F1 pollution
Its panel 16 AMP. 3 POLE MCB changed.Taping side again one same MCB changed. | Other | POLLUTION 1 | |
| 15997 | 04 Jun 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.checked and greasing is done.
2. check the gearbox oil level, leakage, and fill if required. we found leakage so we fill some amount of grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is not ok. its shaft condition is not good.
5. check end traveling gears condition and do the greasing. it is ok.
CT.
gears are ok. it is good in condition.
HT.
1. check rope drum, hook, rope condition. greasing of rope.rope greasing is done. it is in good condition.
2. check the thruster drum condition and its brake tightness.no thruster.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 15998 | 04 Jun 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. checked coupling, shaft, and pedestal bearing condition it is good. Greasing is done.
2. check the gearbox oil level. It is ok no leakage.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition. It is ok and greasing is done.
CT
1. checked coupling, shaft, and pedestal bearing condition it is good. Greasing is done.
2. check the gearbox oil level. It is ok no leakage.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition. It is ok and greasing is done.
HT
1. checked rope drum, hook, rope condition. It is ok.greasing of rope is done. | Other | CHIPPING YARD CRANE NO. 2 | |
| 15999 | 04 Jun 2020 | Scheduled Maintenance | TELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.check it is ok.
2. checking frames welding condition.it is ok.
3. checking cotter pin and its failure condition. it is ok.
| Other | TELPHER (FURNACE 1) | |
| 16000 | 04 Jun 2020 | Scheduled Maintenance | TELPHER FOR F2
1. checking the bearing, rollers condition, and do lubrication.check it is ok.
2. checking frames welding condition.it is ok.
3. checking cotter pin and its failure condition. it is ok.
| Other | TELPHER ( FURNACE 2) | |