Maintenance Report

Search Filter:

Showing 15,891-15,900 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1589117 Jun 2020Scheduled Maintenance3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. checked coupling, shaft, it is ok.
2. check the gearbox oil level. it is ok. no leakage.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.it is ok.


CT.
roller and bearing condition is ok.

HT.
1. check rope drum, hook, rope condition.it is ok.
2. check frame welding conditions. it is ok.
OtherCARBON PASTE LIFTING CRANE
1589217 Jun 2020Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 1

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.
OtherTAPPING SEC. CRANE NO. 1
1589317 Jun 2020Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 2

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.
OtherTAPPING SEC. CRANE NO. 2
1589416 Jun 2020Breakdown Maintenance50 hp rewinding motor refitting and pipeline also checking and fitting is done. now its working.OtherBLUE OCEAN
1589516 Jun 2020Breakdown MaintenanceForm Mansa
50 hp motor is burned .its rewinding and fitting is done.
OtherBLUE OCEAN
1589616 Jun 2020Scheduled MaintenanceWATER CIRCULATION PUMP 1,2,3, checked it is ok.
FURNACE 1
GRANULATION PUMP 1,2 it is ok. Greasing is done.
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1 it is ok.

FURNACE 2
GRANULATION PUMP 1,2, it is ok.greasing is done.
POLLUTION WATER PUMP NO 1, it is ok.
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1

1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.it is ok.
OtherPUMP
1589716 Jun 2020Scheduled MaintenanceF1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1

F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.check and clean. All loose bolts and nuts tight.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing. It is ok.
OtherPUMP
1589815 Jun 2020Breakdown MaintenanceIt's buket edge is damaged. So we cut it and weld one new 20 mm boiler plate. OtherLODER NO.2
1589915 Jun 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. IT IS OK.
2. check panel board, clean, & tight all loose parts. CLEAN AND TIGHTENING ALL LOOSE PARTS.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.IT IS OK.
OtherRMHS CONVEYOR
1590015 Jun 2020Scheduled Maintenancecheck Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. CHECKING AND ADJUSTING VIBRATION IS DONE. IT IS OK.OtherRMHS VIBRO FEEDER