| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 15881 | 18 Jun 2020 | Breakdown Maintenance | Discharge conveyor , BC 1 VIBRATOR side cover fitting is done. | Other | WASHING PLANT | |
| 15882 | 17 Jun 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. | Other | TAPPING SEC. CRANE NO. 3 | |
| 15883 | 17 Jun 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT, C.T, AND H.T. 1. checked the motor condition ( amp, volt, and connectivity). no noise coming. it is ok. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. | Other | CARBON PASTE LIFTING CRANE | |
| 15884 | 17 Jun 2020 | Breakdown Maintenance | BELT CONVEYOR NO 2 Its belts changing is done.now its ok. | Other | RMHS SHUTTLE CONVEYOR ( BELT CONVEYOR NO. 2) | |
| 15885 | 17 Jun 2020 | Breakdown Maintenance | It's starter relay is damaged. It's changed. | Other | LODER NO.2 | |
| 15886 | 17 Jun 2020 | Breakdown Maintenance | its shaft is broken. we make a new one. we fit the new shaft and 2 counterweights.its weight is 8 kg each. | Other | VIBRATOR SCREEN MACHINE ( WASHING PLANT) | |
| 15887 | 17 Jun 2020 | Scheduled Maintenance | its pollution tower work is complete. | Other | POLLUTION 2 | |
| 15888 | 17 Jun 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. SHAFT CONDITION IS GOOD. 2. check the gearbox oil level, leakage, and fill if required. GRAR BOX HAS LEAKAGE. WE FILL GREASE INSIDE. 3. check all fasteners and mounting bolts. IT IS OK. 4. check frame welding conditions. IT IS OK. 5. check end traveling gears condition and do the greasing. CT. Greasing of the gearbox is done. its belt and pully condition is ok. HT. greasing of rope is done. hook and wire rope condition is ok. | Other | TAPPING SEC. CRANE NO. 1 | |
| 15889 | 17 Jun 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2 LT. 1. checked coupling, shaft, and pedestal bearing condition and do the greasing. we greasing all couplings. 2. checked the gearbox oil level it is ok. no leakage. 3. checked all fasteners and mounting bolts.it's ok. 4. checked frame welding conditions.it is ok. 5. checked end traveling gears condition. it is ok. and greasing is done. CT. 1. checked coupling, shaft, and pedestal bearing condition and greasing done.it is ok. greasing is done. 2. check the gearbox oil level. there is leakage in the gearbox. so we put some grease. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions.it is ok. 5. check end traveling gears condition. it is ok. greasing is done. HT. 1. check rope drum, hook, rope condition.it is ok. The greasing of wire rope is done. 2. check the thruster drum condition and its brake tightness. it is ok. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. it is ok. | Other | TAPPING SEC. CRANE NO. 2 | |
| 15890 | 17 Jun 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Checking and greasing are done. It is ok. 2. check the gearbox oil level, leakage, and fill if required. No leakage but we fill grease. 3. check all fasteners and mounting bolts. It is OK. we fit 5 nos. bolts. 4. check frame welding conditions. It is ok.we tight all loose bolts. 5. check end traveling gears condition and do the greasing. It is ok. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. It is ok. 2. check the gearbox oil level, leakage, and fill if required. Leakage is there so we fill grease. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok. And greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope. It is ok. 2. check the thruster drum condition and its brake tightness. It is ok. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. It is ok. 5. gearbox is leakage and makes too much sound so we put grease. | Other | TAPPING SEC. CRANE NO. 3 | |