| 15671 | 10 Jul 2020 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank. its ok. we fill some oil next time.
2. check solenoid valve working conditions and adjust oil pressure. its ok.
3. check hydraulic line leakage. its ok. | Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 15672 | 10 Jul 2020 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank. we fill 100 ltr. oil next week.
2. check solenoid valve working conditions and adjust oil pressure. it's ok.
3. check hydraulic line leakage. one cylinder of electrode 3 has leakage. we tight bolts when it will in shutdown. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 15673 | 10 Jul 2020 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves. we fit one valve when the furnace was shut down. it is leakage. we repair it when the furnace will going shutdown.
2. check leakage of hose pipes. its ok. | Furnace I | WATER MAINEFOLD | |
| 15674 | 10 Jul 2020 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.its ok.
2. check leakage of hose pipes.its ok. | Furnace II | WATER MAINEFOLD | |
| 15675 | 10 Jul 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.clean.
2. check leakage of hydraulic oil. if it is then informed to HOD.no leakage. | Furnace I | ELECTRODE 2 | |
| 15676 | 10 Jul 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.clean.
2. check leakage of hydraulic oil. if it is then informed to HOD.no leakage. | Furnace I | ELECTRODE 3 | |
| 15677 | 10 Jul 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders. clean.
2. check leakage of hydraulic oil. if it is then informed to HOD.
no leakage. | Furnace I | ELECTRODE 1 | |
| 15678 | 10 Jul 2020 | Scheduled Shutdown | electrode 3
seal box side fire is coming from inside. we need to protect it. so we fit one asbestos cloth on electrode 3 side on seal box. | Furnace I | ELECTRODE 3 | |
| 15679 | 10 Jul 2020 | Breakdown Maintenance | It's A3, A4 and A6 clamp has laeakage. We put pulp now it's ok. | Furnace II | ELECTRODE 1 | |
| 15680 | 09 Jul 2020 | Breakdown Maintenance | Its front right side lead spring is damage. We open it and making one new plate and 2 nos. Centre bolt changing (right and left) | Other | TATA TIPPER | |