| 15661 | 10 Jul 2020 | Scheduled Maintenance | FURNACE 1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok.
| Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 15662 | 10 Jul 2020 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 1 | |
| 15663 | 10 Jul 2020 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |
| 15664 | 10 Jul 2020 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |
| 15665 | 10 Jul 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 15666 | 10 Jul 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 15667 | 10 Jul 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.its ok.
2. check transformer oil leakage.its ok.
3. check crystal color.its ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |
| 15668 | 10 Jul 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level. its ok.
2. check transformer oil leakage.its ok.
3.check crystal colors.its ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |
| 15669 | 10 Jul 2020 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition. we check all solenoid valves. we change 7 no. chutes solenoid.
2.check pneumatic cylinders and air supply lines. its ok.
3. check charging chute leakage. if it is then inform HOD. | Furnace I | CHARGING CHUTES | |
| 15670 | 10 Jul 2020 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition. we check all solenoid valves. we change no. 7 charging chutes solenoid next time.
2.check pneumatic cylinders and air supply lines. its ok.
3. check charging chute leakage. if it is then inform HOD. small leakage in chutes we repair it when its shut down. | Furnace II | CHARGING CHUTES | |