Maintenance Report

Search Filter:

Showing 15,641-15,650 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1564113 Jul 2020Breakdown MaintenanceIt's front light bulb changing is done.OtherLODER NO. 9
1564213 Jul 2020Breakdown MaintenanceBrake hose nipple changing is done. Now it's ok.OtherESCORT HYDRA
1564313 Jul 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. it's ok.
2. check panel board, clean, & tight all loose parts. clean and tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly. its ok.

OtherRMHS CONVEYOR
1564413 Jul 2020Scheduled MaintenanceALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. its ok.
OtherRMHS VIBRO FEEDER
1564513 Jul 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings. greasing is done.
2. lubrication of rollers and check conditions. we fix BC 6 and BC 1 rollers.
3. check belt status ( if damaged than inform and change) and also check tightness, speed. it's ok. we tight BC 6 belt and fix fasteners.
4. gearbox oil level check and if not then fill as per requirement. BC 7 has leakage. we fill grease.
5. check coupling and key ( if damaged than inform and change) and do the greasing.it's ok. we need to change BC 6 coupling. its making work is in progress.
6. check the drum condition. it's ok.
7. check mounting frame welding condition. we weld BC 7 and BC 6 side holes.
8. check rollers condition and if not good then change.
OtherRMHS CONVEYOR
1564612 Jul 2020Breakdown MaintenancePollution gate is filled with dust and mud. We clean it and open.OtherPOLLUTION 1
1564711 Jul 2020Breakdown MaintenanceH.T.
its coil is burning. we send motor for rewinding.
REWINDING IS DONE. ITS HANDOVER TO MECHANICAL DEPT. FOR FITTING ON CRANE.
OtherTAPPING SEC. CRANE NO. 2
1564811 Jul 2020Breakdown MaintenanceIt's brake cylinder hose pipe is broken. We fitting new one.OtherESCORT HYDRA
1564911 Jul 2020Breakdown Maintenance
Engine maintenance with 18 ltr. Oil.

2 nos. Primary and secondary Engine oil filter .
And 2 nos. Primary and secondary diesel filter changed.
OtherLODER NO.2
1565011 Jul 2020Scheduled Maintenance1.check transformer temp. and oil level.it's ok.
2. check transformer oil leakage.its ok.
3.check crystal colors.it's ok.
Furnace IFURNACE 1 TRANSFORMER