| 15561 | 24 Jul 2020 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves. some t section is not good. and some dummies also not in good condition.
2. check leakage of hose pipes.it is ok. | Furnace I | WATER MAINEFOLD | |
| 15562 | 24 Jul 2020 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves. its ok.
2. check leakage of hose pipes.it is ok. | Furnace II | WATER MAINEFOLD | |
| 15563 | 24 Jul 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.clean and tight all hydraulic bolts and nuts.
2. check leakage of hydraulic oil. if it is then informed to HOD.small leakage we tight its nut and bolts in shutdown.
3. its inside seal box protection shield is damaged. we need urgently a bending machine for making it. | Furnace I | ELECTRODE 3 | |
| 15564 | 24 Jul 2020 | Breakdown Maintenance | It's rear left tyre is puncherd. We reapaire it. Now it's ok. | Other | MAHINDRA TRACTOR | |
| 15565 | 23 Jul 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done.
2. check the gearbox oil level, leakage, and fill if required. It is OK.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition and do the greasing. It is ok.
CT.
It is ok. Gear bearing is ok.
HT.
It's is ok. Pulley condition is ok. | Other | CARBON PASTE LIFTING CRANE | |
| 15566 | 23 Jul 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE
LT., CT. ,HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts. Clean and tighting all loose parts.
3. all parts clean by hand blower.
4. No limit switches. | Other | CARBON PASTE LIFTING CRANE | |
| 15567 | 23 Jul 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.checked and greasing is done.
2. check the gearbox oil level, leakage, and fill if required. we found leakage so we fill some amount of grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is not ok. its shaft condition is not good.
5. check end traveling gears condition and do the greasing. it is ok.
CT.
gears are ok. it is good in condition.
HT.
1. check rope drum, hook, rope condition. greasing of rope.rope greasing is done. it is in good condition.
2. check the thruster drum condition and its brake tightness.no thruster.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 15568 | 23 Jul 2020 | Scheduled Maintenance | TELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.check it is ok.
2. checking frames welding condition.it is ok.
3. checking cotter pin and its failure condition. it is ok.
| Other | TELPHER (FURNACE 1) | |
| 15569 | 23 Jul 2020 | Scheduled Maintenance | TELPHER FOR F2
1. checking the bearing, rollers condition, and do lubrication.check it is ok.
2. checking frames welding condition.it is ok.
3. checking cotter pin and its failure condition. it is ok.
| Other | TELPHER ( FURNACE 2) | |
| 15570 | 23 Jul 2020 | Scheduled Maintenance | POLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.clean and balancing is done.
2. check the balancing of impeller and vibration isolation.it is ok.
3. check v belts condition and inform if it's on critical stage.it is ok.
4. check foundation bolts and nuts of Plummer blocks.it is ok.
5. greasing the Plummer blocks.greasing is done.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature. it is ok. | Other | POLLUTION 1 | |