| 15531 | 27 Jul 2020 | Scheduled Maintenance | ALL CONVEYORS BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 1. greasing of bearings.greasing is done. 2. lubrication of rollers and check conditions.its ok. 3. check belt status ( if damaged than inform and change) and also check tightness, speed. we will change BC 1 and BC 6 when its coming.WE REPAIR BC 2 AND BC 6. 4. gearbox oil level check and if not then fill as per requirement.its ok. 5. check coupling and key ( if damaged than inform and change) and do the greasing.it's ok. we will change BC 1 motor coupling when we change belt. 6. check the drum condition. its ok. 7. check mounting frame welding condition.its ok. 8. check rollers condition and if not good then change. | Other | RMHS CONVEYOR | |
| 15532 | 27 Jul 2020 | Breakdown Maintenance | crusher side plate fixing is done. | Other | CRUSHER ( WASHING PLANT) | |
| 15533 | 27 Jul 2020 | Scheduled Maintenance | G.M. room side wiring is done. | Other | GUEST HOUSE | |
| 15534 | 25 Jul 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing.greasing is done. 2. check the gearbox oil level, leakage, and fill if required.no leakage. We fill a small amount of grease. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions.it is ok 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing.greasing is done. Shaft condition is ok. 2. check the gearbox oil level, leakage, and fill if required.no leakage. We fill a small amount of grease. 3. check all fasteners and mounting bolts. it's ok. 4. check frame welding conditions.it is ok. 5. check end traveling gears condition and do the greasing. Greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope.greasing is done. 2. check the thruster drum condition and its brake tightness.no thruster. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 15535 | 25 Jul 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.clean and tight all hydraulic bolts and nuts. 2. check leakage of hydraulic oil. if it is then informed to HOD.we tight hydraulic nut and bolts in shutdown. | Furnace I | ELECTRODE 2 | |
| 15536 | 25 Jul 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.clean and tight all hydraulic bolts and nuts. 2. check leakage of hydraulic oil. if it is then informed to HOD.small leakage we tight its nut and bolts in shutdown. | Furnace I | ELECTRODE 1 | |
| 15537 | 25 Jul 2020 | Scheduled Maintenance | TILTING HOPPER 1. greasing all bushes.greasing is done. 2.hydraulic pump and motor coupling. It's ok. 3. checking the hydraulic oil level and if not then fill. it's ok. The oil level is good. 4. check hopper welding sections. It's ok. CONVEYOR NO 1 1. greasing of bearings. Greasing is done. 2. lubrication of rollers and check conditions. Check and greasing is done. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.its not ok. We mount some conveyor pieces and fasteners. 4. gearbox oil level check and if not then fill as per requirement.it's ok. Grease filling is done. 5. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok. 6. check the drum condition. It's ok. 7. check mounting frame welding condition. it's ok. 8. check rollers condition and if not good then change.chnaged. CRUSHER 1. check the crusher foundation.it's ok. 2. check V belts condition.it's ok. good in condition. 3. do greasing. greasing in the bearing is done. 4. check spring rod condition and the gap between plates.it's ok. VIBRATOR 1. check the spring condition. It's ok. 2. check V belts condition. it's ok. 3. check vibrations if not good then adjust. it's ok. 4. check the frame welding condition. it's ok. 5. Greasing of bearing is done. ROLLER today we change its mesh. size is 10 mm hole, 4 mm wire thickness, and 3.9 mtr length, 1 mtr width. 1. check roller speed.it's ok. 2.greasing of bearings.greasing of bearing is done. 3.gearbox oil level check and if not then fill as per requirement.it's ok. 4. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok. 5. check the drum condition. it's ok. 6. check the mounting frame welding condition. it's ok. DISCHARGE CONVEYOR 1. greasing of bearings.greasing is done. 2. lubrication of rollers and check conditions.its ok. Greasing is done. 3. check belt status ( if damaged than inform and change) and also check tightness, speed. its ok.we repairs conveyor. 4. gearbox oil level check and if not then fill as per requirement. its ok.filling grease is done. 5. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok. Greasing is done. 6. check the drum condition. 7. check mounting frame welding condition. it's ok. 8. check rollers condition and if not good then change. we change 3 nos. rollers. | Other | WASHING PLANT | |
| 15538 | 25 Jul 2020 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. Check it is ok. 2. check panel board, clean, & tight all loose parts. Clean and tight all lose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. It's ok. 5. check the high mast lights also. it's ok. | Other | WASHING PLANT | |
| 15539 | 25 Jul 2020 | Breakdown Shutdown | incomer cable termination failure. it is repaired. now its ok. | Furnace I | INCOMER CABLE FOR BOTH FURNACE | |
| 15540 | 24 Jul 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing.check bearing condion it is ok. And greasing is done. 2. check the gearbox oil level, leakage, and fill if required. No leakage we fill some grease. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok.greasing is done. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done. 2. check the gearbox oil level, leakage, and fill if required. It's has leakage but we fill some grease. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok. HT. 1. check rope drum, hook, rope condition. greasing of rope. It is ok. Greasing is done. 2. check all fasteners and mounting bolts. It is ok. 3. check frame welding conditions. It is ok. | Other | TAPPING SEC. CRANE NO. 1 | |