| 15521 | 29 Jul 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done. 2. check the gearbox oil level, leakage, and fill if required. It is OK. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions.it is ok. 5. check end traveling gears condition and do the greasing. It is ok. 6. CT. It is ok. Gear bearing is ok.w HT. It's is ok. Pulley's condition is ok. rope greasing is done. | Other | CARBON PASTE LIFTING CRANE | |
| 15522 | 29 Jul 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. | Other | TAPPING SEC. CRANE NO. 1 | |
| 15523 | 29 Jul 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. | Other | TAPPING SEC. CRANE NO. 2 | |
| 15524 | 29 Jul 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. | Other | TAPPING SEC. CRANE NO. 3 | |
| 15525 | 29 Jul 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT., CT. ,HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok. 2. check panel board, clean, & tight all loose parts. Clean and tighting all loose parts. 3. all parts clean by hand blower. 4. No limit switches. | Other | CARBON PASTE LIFTING CRANE | |
| 15526 | 28 Jul 2020 | Scheduled Maintenance | ALL VIBRATORS check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations.CHECKING AND ADJUSTING VIBRATION IS DONE. IT IS OK. | Other | RMHS VIBRO FEEDER | |
| 15527 | 28 Jul 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1,2,3, pump no. 2 is ready. FURNACE 1 GRANULATION SUBMERSIBLE PUMP 1,2, PUMP 1,2 it's ok. POLLUTION WATER PUMP NO 1 It has heavy leakage. we fix it with gland rope. but still leakage. we need a new monoblock. FURNACE 2 GRANULATION PUMP 1,2, The greasing of coupling is done. POLLUTION WATER PUMP NO 1, its has leakage. we fix the leakage. now its ok. OFFICE SUBMERSIBLE PUMP 1, WASHING PLANT SUBMERSIBLE PUMP 1 washing plant side pump is ok. 1. check the pump condition and check discharge. 2. check coupling condition, alignment, and do greasing. 3. check pipelines and valve's condition. 4. check cooling towers nozzles condition. its condition is ok. | Other | PUMP | |
| 15528 | 28 Jul 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1 F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1, WASHING PLANT SUBMERSIBLE PUMP MOTOR1 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.check and clean. All loose bolts and nuts tight. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. water circulation pump motor greasing. It is ok. | Other | PUMP | |
| 15529 | 28 Jul 2020 | Scheduled Maintenance | plant side 10 nos. cameras fitting is done. | Other | CAMERA | |
| 15530 | 27 Jul 2020 | Scheduled Maintenance | ALL CONVEYORS BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. it's ok. 2. check panel board, clean, & tight all loose parts. clean and tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. its ok. | Other | RMHS CONVEYOR | |