| 15501 | 31 Jul 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.its seal box rope is damaged. we need to change it. | Furnace I | ELECTRODE 3 | |
| 15502 | 31 Jul 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.smalll amount of leakage in slipping cylinder. | Furnace I | ELECTRODE 1 | |
| 15503 | 31 Jul 2020 | Scheduled Maintenance | Directors' house wiring complete. | Other | GUEST HOUSE | |
| 15504 | 31 Jul 2020 | Scheduled Maintenance | extra correction chute no. 8 connection giving from control room. | Furnace II | CHARGING CHUTE NO. 8 | |
| 15505 | 31 Jul 2020 | Scheduled Maintenance | production team says that vibrator side vibration is less. so we increase 1 kg weight and now it's ok. | Other | VIBRATOR SCREEN MACHINE ( WASHING PLANT) | |
| 15506 | 31 Jul 2020 | Breakdown Maintenance | It's one pedestal bearing (P208) is damage. It's repaired. now its working. | Furnace II | METAL LIFTING TROLLY | |
| 15507 | 30 Jul 2020 | Breakdown Maintenance | vibrator shaft work is in progress. its shaft is ok. we open it and change counterweight. we fit 2 nos. bearing no.is 6313. now its working. | Other | VIBRATOR SCREEN MACHINE ( WASHING PLANT) | |
| 15508 | 30 Jul 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.greasing is done.
2. check the gearbox oil
level, leakage, and fill if required.no leakage. We fill a small amount of grease.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.greasing is done. Shaft condition is ok.
2. check the gearbox oil level, leakage, and fill if required.no leakage. We fill a small amount of grease.
3. check all fasteners and mounting bolts. it's ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition and do the greasing.
Greasing is done.
HT.
1. check rope drum, hook, rope condition. greasing of rope.greasing is done.
2. check the thruster drum condition and its brake tightness.no thruster.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 15509 | 30 Jul 2020 | Scheduled Maintenance | TELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.check it is ok.
2. checking frames welding condition.it is ok.
3. checking cotter pin and its failure condition. it is ok.
| Other | TELPHER (FURNACE 1) | |
| 15510 | 30 Jul 2020 | Scheduled Maintenance | TELPHER FOR F2
1. checking the bearing, rollers condition, and do lubrication.check it is ok.
2. checking frames welding condition.it is ok.
3. checking cotter pin and its failure condition. it is ok.
| Other | TELPHER ( FURNACE 2) | |