Maintenance Report

Search Filter:

Showing 15,431-15,440 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1543107 Aug 2020Scheduled MaintenanceELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 2
1543207 Aug 2020Scheduled Maintenance ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 3
1543307 Aug 2020Scheduled MaintenanceFURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok.
Furnace IIHYDRAULIC POWER PACK NO. 1
1543407 Aug 2020Scheduled MaintenanceFURNACE 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok.
Furnace IIHYDRAULIC POWER PACK NO. 2
1543507 Aug 2020Scheduled Maintenance1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color.it is ok.
Furnace IIFURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR)
1543607 Aug 2020Scheduled Maintenance1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color.it is ok.
Furnace IIFURNACE 2 TRANSFORMER NO. 2
1543707 Aug 2020Scheduled Maintenance1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color.it is not ok. when its come we will change it.
Furnace IFURNACE 1 TRANSFORMER
1543807 Aug 2020Scheduled Maintenance1.check solenoid valve condition and its pipe condition. it's ok. no leakage.
2.check pneumatic cylinders and air supply lines. it is ok.
3. check charging chute leakage. if it is then inform HOD.
Furnace ICHARGING CHUTES
1543907 Aug 2020Scheduled Maintenance1.check solenoid valve condition and its pipe condition. it's ok. no leakage.
2.check pneumatic cylinders and air supply lines. it is ok.
3. check charging chute leakage. if it is then inform HOD.
Furnace IICHARGING CHUTES
1544007 Aug 2020Scheduled Maintenance1. checking loose parts and check the hydraulic oil level in the tank.its ok.
2. check solenoid valve working conditions and adjust oil pressure.solenoid is ok.
3. check hydraulic line leakage.
Furnace IHYDRAULIC POWER PACK NO. 1