1542110 Aug 2020Otherfor Mansa
washing plant roller and conveyor making is done. We make one roller ,one conveyor and feeding hopper. It's fitting also done.
OtherBLUE OCEAN
1542208 Aug 2020Scheduled Maintenancebecause of no washed material we not doing its maintenance.
we doing all maintenance on Tuesday.

TILTING HOPPER
1. greasing all bushes.
2.hydraulic pump and motor coupling.
3. checking the hydraulic oil level and if not then fill.
4. check hopper welding sections.

CONVEYOR NO 1
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.

CRUSHER
1. check the crusher foundation.
2. check V belts condition.
3. do greasing.
4. check spring rod condition and gap between plates.

VIBRATOR
1. check the spring condition.
2. check V belts condition.
3. check vibrations if not good then adjust.
4. check the frame welding condition.

ROLLER
1. check roller speed.
2.greasing of bearings.
3.gearbox oil level check and if not then fill as per requirement.
4. check coupling and key ( if damaged than inform and change) and do the greasing.
5. check the drum condition.
6. check the mounting frame welding condition.

DISCHARGE CONVEYOR
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
OtherWASHING PLANT
1542308 Aug 2020Scheduled Maintenancebecause of no washed material we not doing its maintenance.
we doing all maintenance on Tuesday.


WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also.
OtherWASHING PLANT
1542407 Aug 2020Breakdown MaintenanceTyre puncher left back side. It's puncher maintenance is done.OtherLODER NO.2
1542507 Aug 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 1
1542607 Aug 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 2
1542707 Aug 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 3
1542807 Aug 2020Scheduled MaintenanceFURNACE 1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok.

Furnace IHYDRAULIC POWER PACK NO. 1
1542907 Aug 2020Scheduled MaintenanceFURNACE 1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok.
Furnace IHYDRAULIC POWER PACK NO. 2
1543007 Aug 2020Scheduled Maintenance ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 1